STEP 03
A. Attach three Pulleys (20) to Upper Beam (2) with three M10*50 Bolts (31), six M10
Washers (36) and three M10 Lock Nuts (38).
B. Attach Upper Beam (2) to Guide Rods (1) with two M10*65 Bolts (32) and two M10
Washers (36).
C. Attach Upper Beam (2) to Front Column (3) with M10*65 Bolt (32), two M10
Washers (36) and M10 Lock Nut (38).
--------------------------------------------------------------------------------------------------------------------------------------