Do you have a question about the Ares SE2 and is the answer not in the manual?
Check applicable codes, regulations, and permits for installation. Compliance with utility, local, and NFPA codes is required.
Ensure roof load-bearing capacity is adequate for unit weight. Use rails for load distribution and support.
Guidelines for unit placement, including roof or sidewall installation, clearance, and proximity to other systems.
Steps for initial unit startup including checking power, airflow, standpipe, bleed-off kit, and belt tension.
Addresses issues like unit inoperability, insufficient cooling, and low airflow with specific checks.
Checks for mineral buildup on evaporative pads, focusing on bleed off and water coverage.
Details required for ordering parts and obtaining service, including serial, model, and part numbers.
Details warranty period, coverage, and lists conditions that void the warranty.
Instructions for obtaining service and steps for handling unsatisfactory service experiences.