EasyManua.ls Logo

Arrow FDN106 - Before You Begin Preparation; Essential Safety Precautions; Ground Leveling Requirement; Channel and Angle Usage Restriction

Arrow FDN106
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. Before beginning construction, check local building codes regarding footings, location and other
requirements. Study and understand this owner's manual.
2. Follow all directions and dimensions carefully.
3. Follow the step sequence carefully for successful results.
4. Be sure all the parts fit together properly before proceeding.
5.
IMPORTANT: Remove Owner's Manual from main carton of your storage building and locate Interior
Dimensions on the front cover.
6. SAFETY FIRST: Care must be taken when handling various pieces of your kit since some contain sharp
edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any
maintenance on your kit.
7. BASIC TOOLS: No. 2 Phillips screwdriver, pliers, work gloves, tape measure, level and a spade or shovel.
8. GROUND
MUST BE LEVEL!
9. DO NOT STEP ON CHANNELS OR ANGLES UNTIL FLOORING MATERIAL IS IN PLACE!
10. Separate contents of the carton by the part number while reviewing parts list.
BEFORE YOU BEGIN....
Parts List
Quantity
Part Number Part Description in Carton
9216 Front & Rear Channel 62" 157,5 cm 4
9217 Side Channel 49 1/2" 125,7 cm 12
0572 Corner Angle 4
9214 Cross Channel 21 7/16" 54,5 cm 3
9215 Cross Channel 32" 81,3 cm 4
9715 Cross Channel 19 3/16" 48,7 cm 2
65004
#8Ax5/16" (8 mm)
Screw (60)
65923
#8-32x3/8" (10 mm)
Bolt (36)
65103
#8-32 Hex Nut (36)

Related product manuals