EasyManua.ls Logo

ascon M4 series - Technical Specifications; Controller Features; PV Input Specifications

ascon M4 series
53 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
45
6 - Special functions
D Counting start time = timer
launch time, end with control
output forced to zero.
The time counting starts when the timer
is launched. At the end, the control output
is forced to zero. [1]
E No control action during
the counting time.
The time counting starts when the timer
is launched and the control output is
forced to zero. At the end, the control
action starts.
F Control action with stand-by
Setpoint during the counting
time
The time counting starts when the timer
is launched and the control action use the
Stand-by Setpoint. At the end, the control
action use the working Setpoint.
[1] When the Timer is not running the con-
trol output is forced to zero, also before the
Timer launch
#tiMe
T
imer launch
Setpoint
Process
variable PV
Output OP
OP3
#t.Mod = 5
#tiMe
T
imer launch
Setpoint
Process
variable PV
Output OP
OP3
#t.Mod = 6
#tiMe
Timer launch
Setpoint
Process
variable PV
Output OP
OP3
#s.p. 2
#t.Mod =7
M4UK.ed6 20-05-2005 11:43 Pagina 45