Do you have a question about the Ashida ADR241A and is the answer not in the manual?
Contact Arrangement | DPDT |
---|---|
Operating Voltage | 24 VDC |
Contact Form | 2 Form C |
Coil Voltage | 24 VDC |
Relay Type | Electromechanical |
Release Time | 5ms |
Insulation Resistance | 100 MΩ |
Dielectric Strength | 1500 VAC for 1 minute |
Ambient Temperature | -40°C to 70°C |
Ensures equipment is installed and handled safely.
Safety precautions for CT secondary circuits.
Key protection and control functions of the relay.
Detailed technical parameters of the relay.
Specifications for current transformer inputs.
Specifications for auxiliary power supply.
Accuracy details for protection functions.
Information on standard tests performed on the relay.
Step-by-step guide for installing the relay.
Procedure for flush panel mounting of the relay.
Instructions for connecting the relay and understanding diagrams.
Critical checks before powering up the relay.
Safety procedures for CT secondary circuits.
Details on terminal blocks for various connections.
Wiring guidelines for auxiliary power supply.
Importance and procedure for earthing the relay.
Physical dimensions and electrical connection layouts.
Wiring diagram for 3-phase, 3-wire connection.
Wiring diagram for 3-phase, 4-wire connection.
Capabilities of the Relay Talk software.
Step-by-step guide for using Relay Talk software.
Description of the main screen in Relay Talk software.
Required field data for relay setting calculations.
Breaker failure setting and logic.
Settings and logic for phase over current faults.
Settings and logic for ground over current faults.
Application of the MODBUS standard to the ADITYAV2 platform.
Application of the IEC 60870-5-103 standard.
Description of the relay's front panel interface.
Accessing and configuring relay settings.
Step-by-step guide to set relay parameters.
Flowchart for setting relay parameters.
Step-by-step flowchart for setting relay parameters.
Tests and equipment needed for relay verification.
Steps to verify external circuit connections and continuity.
Ensuring application-specific settings are correctly applied.
Procedures for testing relay calibration and measurement.
Testing pickup and trip values and timing.