EasyManua.ls Logo

Assum DZ-400/2E - Table of Contents

Default Icon
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Contents
Foreword/Description/Responsibilities∙∙∙1 8.Failure Analysis and solutions
1.Product instruction 1)Machine failure and solution∙∙∙∙∙∙∙∙28
1) Application∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙2 2)Vacuum pump failure & solution∙∙29
2) Product Features∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙2 3) Solenoid valve failure & solution∙30
3) Work Principle∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ 2 4).Sealing problem and solutions∙∙∙∙30
4) Product Model Name∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙2 9. Equipment storage
5) Main parameters∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙3 1)short time storage∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙30
2.Safety 2)Long time storage∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙30
Ready to use∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙9 3) Start machine after storage∙∙∙∙∙∙∙∙31
1) Safety precautions∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙9
2) Use of the environment∙∙∙∙∙∙∙∙∙∙∙∙10
3.Handling equipment
1) Equipped with carton packaging∙∙∙∙∙∙∙∙10
2) Equipped with wooden packaging∙∙∙∙∙10
4.Installation
1) Installation condition∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙11
2) Installation Environment∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙12
3) Filling Oil∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙12
4) Electrical connection ∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙13
5) Connection inflation system∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙14
6) Connecting vacuum system∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙15
5.Start-up & Debugger
1) control panel∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙15
2) Turn on the power∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙16
3) Check the pump motor rotation direction∙∙∙∙∙∙16
6.Standard operation and parameter settings
1) Standard operating procedures∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙17
2) Control program cycle description∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙18
3) parameter settings∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙20
4) Optimal parameters∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙21
5) Packaging liquid products∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙22
6) Best packaging∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙22
7.Machine maintenance
1) Standard maintenance schedules∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙23
2) Vacuum pump maintenance∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙23
3) Vacuum pump oil∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙26
4) Replace high temp. tape, electric heating wire∙∙∙∙∙∙∙∙∙∙26
5) Replace silicone∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙27
6) Replace the seals∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙28

Table of Contents

Related product manuals