EasyManua.ls Logo

Aston Global Langham SDR978 User Manual

Aston Global Langham SDR978
27 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
ON
 
INSTALLATION AND OWNER'S MANUAL
LANGHAM (SDR978)
Shower Door Model Number: SDR978.00-48-L

05/16 Rev C
P/N :SDR978.00-48-L
Question and Answer IconNeed help?

Do you have a question about the Aston Global Langham SDR978 and is the answer not in the manual?

Aston Global Langham SDR978 Specifications

General IconGeneral
BrandAston Global
ModelLangham SDR978
CategoryOther
LanguageEnglish

Summary

Before you start

Pre-Installation Checks and Site Preparation

Ensures proper inspection of parts, compliance with building codes, and preparation of installation surfaces.

Installation Requirements and Warnings

Details the need for professional installation, product features, and warnings for specific wall types.

Product Certifications

Lists the US, Canadian, and International Standards the shower doors meet.

Detailed Diagram of Shower Door Components

Parts List and Identification

A comprehensive list of components with their corresponding key numbers and quantities.

Installation Guide

Tools Required for Installation

Illustrates and lists all necessary tools for a successful shower door installation.

Assembly Attention and Preparation

Highlights the need for multiple people and preparation steps before assembly.

Preparation of base for installation of shower tray

Shower Tray Placement and Leveling

Guidance on positioning the shower tray for optimal support and checking for level.

Drain Alignment

Specific instructions for aligning the shower tray drain with the floor drain.

Base Preparation Continued

Securing the Shower Tray

Details on how to attach the shower tray to wall studs, including pilot drilling advice.

Left-Handed Shower Tray Installation

Door Opening Direction

Notes on the fixed door opening direction for the left-handed model.

Component Identification

Diagrams illustrating the fixed glass and sliding door placement for left-handed installation.

Shower Door Installation

Measuring and Cutting the Top Rail

Instructions on how to measure and cut the top rail to fit the shower opening.

Mark the Top Rail Location

Pre-assembly and Wall Marking

Steps for pre-assembling the top rail with fixed glass and marking installation points.

Top Rail and Fixed Glass Assembly

Securing Components to the Wall

Instructions for attaching wall mounts and rail ends to the shower walls.

Glass Clamp Installation

Procedure for installing the glass clamp onto the fixed glass panel.

Sliding Door Track Divider Setup

Steps for positioning and securing the sliding door track divider.

Top Rail Assembly To Shower

Wall Mount Installation and Rail End Attachment

Details on drilling holes, installing wall mounts, and securing rail ends.

Glass Clamp and Track Divider Installation

Steps for installing glass clamps and the sliding door track divider.

Shower Rail and Component Installation

Wall Mount and Rail End Connection

Guidance on connecting wall mounts and rail ends to the top rail assembly.

Glass Clamp and Track Divider Mounting

Procedure for mounting glass clamps and the sliding door track divider.

Install Wheel Rollers onto the Door

Roller Assembly Attachment

Details on how to correctly attach the upper roller assemblies to the sliding door.

Hanging the Door

Roller Cam Adjustment

Procedure for adjusting the roller cam to ensure the door hangs plumb.

Bottom Roller Installation and Gap Setting

Instructions for installing bottom rollers and setting the correct gap.

Install the Door Threshold

Measuring and Cutting Threshold Bar

Steps for accurately measuring and cutting the threshold bar to fit the opening.

Threshold Bar Mounting and Sealing

Instructions for mounting the threshold bar and applying sealant for water protection.

Threshold Installation Details

Drilling and Securing Threshold

Guidance on drilling holes and securing the threshold bar assembly.

Applying Sealant

Instructions for applying silicone sealant to the bottom of the threshold.

Installing the door seals

Door Seal Placement

Diagram and instructions for correctly installing the door seals.

Installing the door handle

Door Handle Assembly

Procedure for installing the door handle using the provided hardware.

Final sealing

Applying Silicone Sealant

Guidance on sealing the fixed glass, shower base, and track divider.

Care and Maintenance

Cleaning Recommendations

Advice on cleaning glass doors and panels to prevent water spots.

Warranty

Warranty Terms and Conditions

Comprehensive explanation of the limited warranty for shower doors and trays.

Proof of Purchase and Inspection

Requirements for validating warranty claims, including proof of purchase and inspection.

Delivery Inspection for Glass/Acrylic

Specific instructions for inspecting glass/acrylic panels upon delivery.

Warranty Exclusions and Disclaimers

Items Not Covered by Warranty

Details specific situations and product uses excluded from warranty coverage.

Legal Disclaimers and Limitations

Explains implied warranties, liability limitations, and legal terms.

Warranty Coverage and Support

Customer Responsibilities and Support

Outlines customer duties for repair access and how to contact support.

Warranty Validity Period

Specifies the duration of coverage and conditions for warranty validity.