EasyManua.ls Logo

Atlanta EVA - Page 20

Atlanta EVA
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rev.0 13/01/2020
Operator Panel | TURNTABLE - MAST
16
Eva Synthesi Mytho
X X
F30
Upward cycle in steps of the roll holder carriage;
0
= disabled
X X
F31
Number of step revs (
F30
)
OPT OPT
F32
Film tension on the product during the step cycle rotations
OPT OPT
F33
Only PS (MPS2) carriage: lengthening of the film during the
step cycle rotations
OPT OPT
F34
Number of initial creasing rotations at the base of the product
(after
F05
rotations with film open); if =
0
do not perform
creasing at the base
OPT OPT
F35
0
: creasing in ascent disabled
1
: creasing complete in ascent
(Opt: advanced creasing)
2
: creasing from low rotations up to
the reinforcement (excluded)
(Opt: advanced creasing)
3
: creasing from the reinforcement
(included) at high rotations
(Opt: advanced creasing)
4
: creasing only during reinforcement
OPT OPT
F36
Number of creasing rotations at the top of the product
(Opt: advanced creasing) before performing the creasing
rotations, raise
F63
cm; if
F36
=
0
, do not perform creasing at
high rotations
OPT OPT
F37
0
: creasing in descent disabled
1
: creasing complete in descent
(Opt: advanced creasing)
2
: creasing from the reinforcement
(included) at low rotations
(Opt: advanced creasing)
3
: creasing from high rotations up to
the reinforcement (excluded)
OPT OPT
F38
Number of final rotations at the base of the product; if
F38
=
0
, do not perform creasing
OPT OPT
F39
Crease closing adjustment time (permits wrapping with
partially closed film)

Other manuals for Atlanta EVA

Related product manuals