Installaon & Operaon Manual
Vercal Pivot Gate (VPG) System
VPG Operator-24 (LM)
Before aempng to install, operate or
maintain the operator, you MUST read and
fully understand this manual and follow all
safety instrucons.
This product is to be installed and serviced
by a trained Gate Systems Technician only.
Contact AutoGate for a local professional in
your area.
Question and Answer IconNeed help?

Do you have a question about the AutoGate VPG-24 (LM) and is the answer not in the manual?

AutoGate VPG-24 (LM) Specifications

General IconGeneral
BrandAutoGate
ModelVPG-24 (LM)
CategoryGate Opener
LanguageEnglish

Summary

END USER INSTALLER CHECK OFF LIST

SAFETY INSTRUCTIONS REGARDING PRIMARY SECONDARY ENTRAPMENT PROTECTION

INTERNAL

Describes the internal entrapment sensing system.

EXTERNAL

Describes provisions for external entrapment sensors.

PRIMARY PROTECTION TYPE A INHERENT PROTECTION

Details the primary inherent entrapment protection mechanism.

ENTRAPMENT ALARM

Explains the entrapment alarm activation and reset.

SAFETY INSTRUCTIONS FOR INSTALLER AND END USER

ORIENTATION

GLOSSARY TERMS

Defines key terms and components of the VPG system.

Operator Orientation

Electrical Enclosure

PREPARATIONS PRIOR TO INSTALLATION

SITE PREPARATION PLANNING

Covers site inspection, planning, and conduit requirements.

Concrete Pads

Details requirements and options for concrete pad installation.

Vehicle Loop Installation and Performance

PREPARATIONS PRIOR TO INSTALLATION

RECOMMENDED TOOLS AND EQUIPMENT

Lists essential tools and equipment for installation.

RECEIVING UNLOADING INSTRUCTIONS

Provides guidance on safe receiving and unpacking of the system.

INSTALLATION

Installing VP Gate and Operator

Step-by-step guide for installing the gate and operator.

Lifting Gate Operator

Instructions for safely lifting the gate and operator assembly.

Positioning Gate Panel Drop Arm Operator

Details on positioning the gate and operator on the concrete pad.

Installing Other Components

Cable Wind Bracing

Instructions for installing cable wind bracing for gate stability.

Masted Wind Bracing

Instructions for installing masted wind bracing for gate stability.

Installing Other Components

GATE GUARD

Information on installing the gate guard for safety.

KICK PANEL

Instructions for attaching the kick panel to the operator.

Entrapment Zones

Discusses critical entrapment zones and safety measures.

Initial Power Connection Operator Testing

Connecting Batteries Required

Steps for connecting the required batteries for power.

Verify basic operator system function

How to test the operator's basic functions.

AC POWER CONNECTION

Connecting AC Power

Instructions for connecting the AC power supply to the unit.

Pre-Mounted 120 VAC Electrical Outlet AC Power Switch Electrical Connection

Details the electrical connection of the outlet and switch.

CONTROL BOARD

Timers and Mode Selections S1

Configuration of timers and mode selections on Switch Pack S1.

Mode Selections Switch Pack S1 6-8

Configuration of mode selections on Switch Pack S1 (6-8).

Timers Mode Selections Switch Pack S2 1-8

Configuration of timers and mode selections on Switch Pack S2.

INHERENT REVERSE DEVICE IRD

Primary-Secondary Wiring

Wiring instructions for primary and secondary gate systems.

ACCESSORY COMPONENTS

OPTIONAL ACCESSORY INSTALLATION INSTRUCTIONS

A Reversing Free Exit Loops and Detectors

Installation of loops and detectors for safety and functionality.

B Photoelectric Sensors

Installation steps for photoelectric sensors.

F Keypads

Wiring instructions for keypad installation.

TROUBLESHOOTING CHECKING CONTROL BOARD

Checking Batteries Charging

How to check battery status and charging system.

Gate Will Not Close

Troubleshooting steps when the gate fails to close.

Gate Will Not Open

Troubleshooting steps when the gate fails to open.

TROUBLESHOOTING CHECKING CONTROL BOARD

IRD D2 Led Is Flashing

Diagnosing issues when the IRD LED is flashing.

Fuse(s) Are Blown

Troubleshooting blown fuses and potential causes.

Manual Operation

How to operate the gate manually during power failure.

ELECTRICAL QUICK CHECK GUIDE

CONTROL BOARD LAYOUT

MAINTENANCE

SPRING CHANGING INSTRUCTIONS

TOOLS REQUIRED

Lists the necessary tools for spring changes.

SLIDE ASSEMBLY DETAILS

Details of the slide assembly related to spring changes.

QUICK REFERENCE GUIDE

Balancing a Gate

Procedures for checking and adjusting gate balance.

Control Board Replacement

Steps for replacing the control board.

RIGHTHAND OPERATOR

TYPICAL CONDUIT RUNS

Illustrates common conduit run configurations for the operator.

LEFTHAND OPERATOR

LEFTHAND OPERATOR

POSSIBLE CONDUITS

Lists potential conduit types for the operator.

LEFTHAND OPERATOR

TYPICAL CONDUIT RUNS

Illustrates common conduit run configurations for the operator.

RIGHTHAND OPERATOR

RIGHTHAND OPERATOR

POSSIBLE CONDUITS

Lists potential conduit types for the operator.

Operator PAD Layout Options

TESTING AMPERAGE

GOOSENECK BASE PLATE CS X-0101

Standard Gate Guards and Dimensions