EasyManua.ls Logo

Backyard Discovery 9198012 - Page 21

Backyard Discovery 9198012
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Phase 2
STEP 2
TUBE SLIDE BRACKET
(x6)
A4M00996
(1)-ELBOW TUBE SUB-ASSEMBLY
BOLT PTH WZ
1/4x3/4
(x12)
H100769
NUT LOCK WZ
1/4
(x12)
H100148
NOTE:
ALIGN THE 'L' AND THE 'ARROW' TO ACHIEVE THE
PROPER POSITION WHEN ASSEMBLING THE SLIDE.
NOTE THIS SECTION ASSEMBLY USES CONFIGURATION
'A' SHOWN IN THE REFERENCE PAGE.
TIP:
USE A SCREW DRIVER TO ALIGN HOLES.
NOTE THE "L" AND "ARROW"
MARKINGS TO AID IN
POSITIONING THE METAL
BRACKETS.
148
(x12)
NUT - 1/4"
769
(x12)
BOLT - 3/4"
996
(x6)
TUBE SLIDE BRACKET
ELBOW TUBE SUB-ASSEMBLY
21

Related product manuals