EasyManua.ls Logo

Backyard Products GABLE - SHINGLES INSTALLATION CONTINUED; FIRST AND SECOND ROW SHINGLE INSTALLATION; CONTINUING SHINGLE ROWS

Backyard Products GABLE
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
66
Beginning at front of shed, install rst row of shingles with notch at 1" past roof edge or ush with drip edge.
2
2
FRONT OF
SHED
BACK OF
SHED
Notch
- or -
Drip Edge
Notch
Roof Deck
1"
(2,5 cm)
Flush with starter row.
Flush with starter row.
Continue installing rows of
shingles by staggering at front.
4
SHINGLES
continued...
Install second row of shingles ush at top of rst row's rain slots. Ensure 1" overhang or ush to drip edge at front,
stagger each row.
3
1"
(2,5 cm)
1"
(2,5 cm)
BACK OF
SHED
FRONT OF
SHED
FRONT OF
SHED
Flush with rain slots.
Flush with rain slots.
Notch
Notch

Related product manuals