EasyManua.ls Logo

Balboa Water Group Revolution - User Manual

Balboa Water Group Revolution
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
1
Manufactured under one or more of these patents. U.S. Patents: 5332944, 5361215, 5550753, 5559720, 5,883,459, 6253227, 6282370, 6590188, 6976052, 6965815, 7030343, 7,417,
834 b2, Canadian Patent: 2342614, Australian patent: 2373248 other patents both foreign and domestic applied for and pending. All material copyright of Balboa Water Group.
INSTALLATION AND SERVICE MANUAL
REVOLUTION

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Balboa Water Group Revolution and is the answer not in the manual?

Summary

Legal and User Information

Intellectual Property Advisement

Information regarding the ownership of intellectual property related to the Revolution control system.

End User Warning

Important safety warning for end-users regarding servicing and potential dangers.

Safety Warnings and Precautions

Danger: Risk of Electric Shock

Critical warnings about electrical hazards and required qualifications for electrical work.

Cautionary Notes

General cautions regarding GFCI testing, manual reading, appliance placement, and maintenance.

GFCI Requirements

GFCI Installation Guidelines

Details the code requirement for GFCI installation in spa supply power and placement.

Revolution Overview

System Introduction and Benefits

Overview of the Revolution system, its industry-leading reliability, and user-friendliness.

Key Features: Reliability and User Interface

Highlights system reliability, compact design, and the intuitive topside panel interface.

Revolution Features

Consumer Interface and Usability Innovations

Details innovations in consumer interface, including display, buttons, and user-friendly menus with error codes.

System and Heater Innovations

Covers system innovations like design flexibility and heater advancements for increased reliability and efficiency.

Revolution Specifications

System Models and Part Numbers

Lists system models (60Hz/50Hz) and their corresponding part numbers for various components.

Topside Panels and Couplings

Describes the available topside panel models and the part numbers for tailpiece kits.

Revolution Components

Component Identification

Visual identification and labeling of the main components of the Revolution control system.

System Dimensions

Dimensional Drawings and Measurements

Detailed diagrams showing the physical dimensions of the Revolution unit from various views.

Installation

System Mounting and Placement

Guidelines for mounting the system, minimizing vibration, and avoiding water drip locations.

Top-Side Panel Installation

Instructions for choosing a location, cutting templates (TP600/TP400), and installing the panel and cable.

Terminal Block Connections

Step-by-step guide for making electrical connections to the terminal blocks for different voltage configurations.

Filling and Priming the Spa

Spa Preparation and Power-Up

Steps for filling the spa and powering up the system, including initial diagnostic checks.

Pump Priming Procedure

Detailed instructions on initiating and managing pump priming to purge air from the system.

Troubleshooting Priming Issues

Guidance on resolving problems if pumps do not prime correctly, including repeated attempts and calling for service.

Initial Software Configuration

Setting the System Time

Instructions for setting the internal clock, adjusting hours/minutes, and exiting the time setting mode.

Diagnostic Messages

General System Messages

Explains common messages like temperature status, communication loss, and test modes.

Heater and Sensor Related Messages

Details messages related to heater flow, temperature, and sensor errors requiring attention.

System and Pump Related Messages

Covers messages indicating memory errors, configuration issues, or pumps stuck in the ON position.

Troubleshooting Support

Utilities Menu Navigation

Guide to accessing system information, settings, and fault logs via the Utilities Menu.

Fault Log Interpretation

Explains how to access, navigate, and understand fault log events and message codes.

Advanced System Configuration & Setup

System Configuration Options

Overview of the eight preconfigured system options and how to change them via panel or wiring.

Specific Configuration Setups

Detailed guides for specific system configurations (1-8), including wiring and DIP switch settings.

BP1600 230 V Conversions

Instructions for converting BP1600 models to 230V, detailing setup changes and wiring.

IT Electrical System Configuration

TN and TT Electrical Services

Explains power requirements and wiring for IT electrical systems, covering single and three service configurations.

Software Setup

Performing Software Setup

Step-by-step instructions for software setup, including DIP switch settings and panel operations.

Selecting and Finalizing Configuration

Guide to selecting the desired setup option and saving the configuration.

Spa Information

Specifications & Certifications

Lists key specifications like environmental, mechanical, electrical, certifications, and patents.

Auxiliary Panels and Plumbing Kits

Details auxiliary panel functions and available tailpiece and circ pump insert kits.

Recommended Accessories and Optional Components

Lists recommended installation accessories and optional system components for the spa.

Glossary of Terms

Defines key terms and concepts related to the Revolution system, including priming, filtration, and freeze protection.

Supporting Documents

Manuals and Downloadable Resources

Lists available documentation, including manuals, application notes, and technical site resources.

Codes and Compliance

Electrical Code Adherence

Emphasizes compliance with National and Canadian Electrical Codes and the need for qualified electricians.

Electrical Protection and Safety

Covers requirements for local disconnects, GFCI, conductor usage, and torque values for safe operation.

Voltage Checks

Verifying System Voltages

Instructions for performing voltage checks on the system to ensure correct power supply.

Installation and Setup;Appendix

General Spa Design Guidelines

General guidelines for spa design, system orientations, and circulation system types.

Plumbing and Mounting Guidelines

Provides detailed guidelines for suction/pressure side mounting, filters, and plumbing requirements.

Plumbing Schematics

Illustrates plumbing diagrams for Non-Circ and Circ pump systems, showing various configurations.

Balboa Water Group Revolution Specifications

General IconGeneral
BrandBalboa Water Group
ModelRevolution
CategorySpa Accessories
LanguageEnglish

Related product manuals