INFO. Quality Management.
New VISION 46
52
Beside the internal Construction Department, manned by
15 qualified Design Engineers working with the latest 3D
Technology, the internal Interior Design Department and
the Development Department, Bavaria has installed a
complex and fully integrated Quality Control
Management.
This department is involved in every production process
& step as so is running the final quality check running
from the 5
th
last production station up to the final
commissioning of a new yacht prior to leave the halls.
The file of documentation of the production from each
boat is impressive and contains all the information about
each step from a roll of glass fiber up to the polished
and shiny proud yacht. This allows us to reproduce the
growth of each and individual yacht.
And, as mentioned before, we are proud of this
additional hurdle for a production process but enabling
us to get our yachts up to a quality level, where the
designs and constructions need to be!
The Germanischer Lloyd is surveying the development
and randomly checking the execution of the documented
product specifications.