EasyManua.ls Logo

Baxi Fires Division 742 User Manual

Default Icon
35 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
© Baxi Heating U.K. Limited 2006.
5119074/01
INSTALLER GUIDE
We trust that this guide gives sufficient details to enable this appliance to be installed
and maintained satisfactorily. However, if further information is required,our
Baxi Fires Division Technical Helpline will be pleased to help.
Telephone 08706 061 065 (National call rates apply in the United Kingdom)
In the Republic of Ireland telephone 0044 8706 061 065.
INSTALLER: Please leave this guide with the
owner
THIS APPLIANCE IS FOR USE WITH NATURAL GAS (G20).
WHEN CONVERTED USING CONVERSION KIT NO. 0595211 THIS
APPLIANCE IS FOR USE WITH PROPANE GAS (G31).
THIS APPLIANCE IS SUITABLE ONLY FOR INSTALLATION IN THE UNITED
KINGDOM (GB) AND THE REPUBLIC OF IRELAND (IE).
Model 742
REMOTE CONTROL
INSET LIVE FUEL EFFECT GAS FIRE
Fitted with the
Knightsbridge fascia.
(GC No. 32-264-21)
Question and Answer IconNeed help?

Do you have a question about the Baxi Fires Division 742 and is the answer not in the manual?

Baxi Fires Division 742 Specifications

General IconGeneral
BrandBaxi Fires Division
Model742
CategoryIndoor Fireplace
LanguageEnglish

Summary

Safety and Manual Handling

Appliance Specifications and Data

Handling Refractory Ceramic Fibres (RCF)

Information and precautions for handling materials containing Refractory Ceramic Fibres.

General Installation Requirements and Compliance

Installation Compliance and Standards

Requirements for installation compliance with UK regulations and British Standards.

Flue and Chimney System Requirements

Specifications for suitable flues, minimum sizes, and conformity to BS 5440.

Clearances and Ventilation Requirements

Guidelines on shelf clearances, wall coverings, room suitability, and ventilation.

Gas Supply Connection Procedures

Gas Inlet Connection Procedures

How to connect the gas supply using the provided fittings and pipework.

Hotbox Installation Methods

Hotbox Installation: Front Fixing Method

Detailed steps for installing the hotbox using the front fixing method.

Hotbox Installation: Cable Retention Method

Detailed steps for installing the hotbox using cable retention and floor fixing.

Burner and Supply Pipe Installation

Burner and Supply Pipe Connection

Steps for connecting the burner unit and the gas supply pipe.

Pilot Lighting and Burner Operation Checks

Detailed procedures for lighting the pilot, checking heat settings, and turning the fire on/off.

Full Operating and Safety Checks

Control Settings and Initial Operation Checks

Rechecking all control settings and noting initial operational characteristics.

Spillage Test Procedure

Detailed steps for performing the spillage test using a smoke match.

Flame Supervision System Test

Verifying the operation of the flame supervision and spillage monitoring safety system.

Related product manuals