12
Put the corresponding food in the inner pot, press the "function" button to select the "dessert"
function. The default time is 3 hours. Press the "time" button to set the cooking time. The time
adjustment range is 1-4 hours. Press the "start" button and the product starts to work.
2.
完成后蜂
五声停
1
秒后,程序自动进入保温工作,如无需保温按
/
取消
消工作即可
After the work is completed, the buzzer beeps five times and stops for 1 second, and the
program automatically enters the heat preservation work. If no heat preservation is required,
press the "Start/Cancel" key to cancel the work.
05
糕:
Cake:
1.
食材
Prepare materials
Sugar
Cake powder
Egg
100
100g
100
100g
3
3 pieces
材料不宜多,否会影效果,甚至不熟。
Note: materials should not be too much, otherwise it will affect the effect, or even become raw.
2.
把称好的糖蛋放入容器内一起拌,大
8
左右拌成拉状就可以。
Put the weighed sugar and egg into the container and stir into a silk like shape together for
about 8 minutes.
3.
加入蛋粉并充分拌,直到均匀混合,状面
Add the cake powder and stir well until the mixture is well mixed and there is no dough.
4.
在内的底部均匀上一食用油,在食物拌气泡尚未消失前,将制好的蛋材料倒
入内,合好上盖。
The bottom of the inner pan is evenly coated with a layer of cooking oil. Before the food stirring
bubble disappears, pour the prepared cake material into the inner pot and close the top cover.
5.
按下
功能
键选择
功能,按下
机器入工作状
Press the "function" key to select the "cake" function, and press the "start" key to enter the
working state.
6.
工作完成后蜂
五声停
1
秒后,程序自动进入保温工作,如无需保温按
/
取消
取消工作即可。
After the work is completed, the buzzer beeps five times and stops for 1 second, and the
program automatically enters the heat preservation work. If no heat preservation is required,
press the "Start/Cancel" key to cancel the work.
维护
Repair and maintenance
1
、在清洁电饭煲首先拔掉源插,待完全冷却后方可行。
1. Before cleaning the rice cooker, the power plug should be pulled out first, and then it can be
carried out after cooling completely.