EasyManua.ls Logo

Bego LaserStar T Plus - Page 31

Bego LaserStar T Plus
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
86076 DB-en/03 355.00032
English
LaserStar T Plus
en
Filling up and connecting
Connections
The connections are on the rear side of the device.
Fig. 24 Connection field on the back
Inert gas
For the inert gas supply, the device is equipped with
a hose fitting for compressed air lines with a cross-
section of 3 mm.
The maximum permitted working pressure is 8 bar
(1 bar is recommended).
Cooling water
The water tank has to be filled up with deionised
water before setting the device into operation for the
first time. The procedure is described in the section
CHECKING/REFILLING THE COOLANT.
NOTE
For damages to persons or property caused by
improper connection of the device, warranty
responsibility claims void.
(A) Water filter
(
REPLACING THE WATER FILTER)
(B) Hose connection for optional external extraction and filter unit
(C) Cooling water tank Filler neck for deionized cooling water
(
CHECKING/REFILLING THE COOLANT)
(D) FOOT SWITCH
LASERPULSE
Connector for pedal switch (pulse release, inert gas and
extraction fan)
(E) ARGON Inert gas supply (Argon)
(F) F1 16A
F2 16A
Micro fuses
(G)+(H) MAIN POWER Power input

Related product manuals