EasyManua.ls Logo

BENETEAU 40 - III) SAILS AND RIGGING; Maintenance of the Rigging

BENETEAU 40
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
B40 Owner’s Manual Page 7 of 28
June. 1, 2007
rev 00
III) SAILS AND RIGGING
SPECIFICATIONS OF THE SAILS:
SAILS (as supplied) AREA
Roller furling mast Classic mast
Roller furling main Classic main I 15.00 m I 15.00 m
Total 73.0 m
2
77.3 m
2
J
3.95
m J 3.95 m
Mainsail 33.4 m
2
37.7 m
2
P
13.92
m P 14.02 m
Genoa (140%) 39.6 m
2
39.6 m
2
E
4.80
m E 4.80 m
Maintenance of the Rigging
- Check the standing and running rigging regularly, and at least once per year.
For wire cables:
- Change them as soon as the first frays appear
- Check for corrosion, especially at the terminals with rigging screws.
- Check the good condition of swages and rigging screws.
For synthetic cables (Kevlar, Twaron, etc.) used for running backstays, halyards, sheets, docklines, etc.:
- Change as soon as signs of fray or wear appear.
- Regularly check the other elements of the rigging; sheets, docklines, etc. ; and replace if worn.
J
E
P