WARNING! It is absolutely essential that the oil should not be disposed of
into the drainage or sewage system or into the soil.
7.4) Maintenance Programme
Operation
Every day
Every 7 day
Every year
Check of oil level and condition
O
Check accumulator pressure
O
Check of plant (hoses and connections)
O
Check and clean filters
O
Check pump fitting
O
Check membrane and possible replacement
S
Change oil
S
(500
hours)
Check suction and Delivery side valves
S
Check pump locking screws
S
Key:
O = operation to be effected by operator
S = Operation to be carried out by a specialist technician
(*) N.B. intervals are referred to normal use, calculated on the basis of an 8 hour working