EasyManua.ls Logo

Big Bee SCD 120 - Assembly and Set-Up Instructions; Hitch and PTO Shaft Setup; Component Check and Lubrication

Default Icon
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ASSEMBLY AND SET-UP INSTRUCTIONS
A. Set up A-frame and position hitch pins in proper position. Be sure to use
lock washers and tighten bolts securely. Attach flex chain brace to A-
frame then fasten chain end on tailwheel adjustment bracket.
B. Attach PTO shaft according to instructions/diagram attached to the PTO
shaft.
C. Check all bolts including gearbox mounting bolts, blade bolts and blade
carrier bolts.
D. Adjust the tailwheel bracket to level the rotary cutter or obtain desired
cutting position.
E. Lubricate gearbox, tailwheel hub, tailwheel spindle and PTO U-joints.
F. Attach rotary cutter to the tractor.

Related product manuals