EasyManuals Logo

Billyoh EZE BASE User Manual

Billyoh EZE BASE
3 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
EZE BASE’ INSTRUCTIONS
BillyOh.com – Grassthorpe Road – Sutton on Trent – Newark – Nottinghamshire – NG23 6QX – Tel. 0870 777 8891
THE BILLYOH EZE BASE
*Tape measure not included.
BUILDING ASSEMBLY
STEP BY STEP CONSTRUCTION OF YOUR PRESSURE TREATED EZE BASE
STEP 1: MEASURING YOUR SHED PRIOR TO ASSEMBLY OF ‘EZE BASE’
Measure the length of the building which is to be mounted on the Eze Base and transfer these dimensions to the
two outers supplied. Mark accordingly and trial fit with the floor of the building.
STEP 2: LAYING OUT ALL PARTS
Lay all parts of the Eze Base in their intended place as
demonstrated by the illustration (right). This is to ensure that
the stretchers can be placed equally apart as to support a
building most effectively and to check that all parts have been
received.
‘L’ bracket
Corner
anchors
Stretchers
Outer

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Billyoh EZE BASE and is the answer not in the manual?

Billyoh EZE BASE Specifications

General IconGeneral
BrandBillyoh
ModelEZE BASE
CategoryLawn and Garden Equipment
LanguageEnglish