EasyManua.ls Logo

Bionest SA-4 - Page 10

Default Icon
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Owner’s manual SA 2021-06-07
DOC0014
10
2
peripheral cOmpOnents
One or more of these peripheral components
may complete your system
BIO-R+
TM
The BIO-R+
TM
is a casing installed outside the building, which shelters the
BIOLARM® and the aerator (air pump) supplying the BIONEST® system. The
casing may be secured to a concrete wall or installed on a post, rmly secured
in the ground.
BIO-PUMP
TM
integrated pumping system
The integrated pumping system is preassembled and installed in the last
compartment of the BIONEST® reactor. This system can pump treated waters
to a polishing eld or other discharge point at a higher point than that of the
BIONEST® reactor; this eliminates the need for an external pumping station.
Inside the reactor, a high water level oat with alarm (BIOLARM®) signals an
efuent pump failure.
BIO-UV
TM
ultraviolet ray disinfection unit
The integrated BIO-UV
TM
disinfection unit is preassembled and installed in the
last compartment of the BIONEST® reactor. Treated water is gravity drawn. The
BIOLARM® visual and sound alarm is activated in case of a UV lamp failure or a
high water level in the reactor. Ultraviolet rays penetrate fecal coliforms for an
efcient destruction reaching a quality level above swimming water standards.
UV treatment caters to various problematic situations such as small ground
area, clay soil or difcult compliance-related situations.
Energy consumption : 45 Watts
Total head in meters
Litres / Minute

Related product manuals