EasyManua.ls Logo

Black Series Alpha - Packing Up; Initial Steps

Black Series Alpha
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
PACKING UP
Packing up is almost a reverse of the setting up process but there are a few
differences - the sequence is often important.
Lay everything neatly on the ground as you take things down and then return them to
their appropriate storage in one go.
It is critical that everything is dry before it is put away,
including the floor, walls and ensuite. Pay special attention to the
plastic windows in the awning walls as condensation can form on an
otherwise dry wall.
If the items have to be put away wet they must be opened and
reassembled within 24 hours or mold may start to form.
INITIAL STEPS
1. Turn off all switches in control panel.
2. Zip all windows closed.
3. Disassemble all optional setup items including:
a. Toilet
b. Water Heater
c. Ensuite
d. Floor
e. Walls
f. Awning
g. Skirt
h. Solar Panels
i. Turn Off Gas Tanks
4. Remove all internal bracing poles (#7 and #13)
5. Lower internal support hoops to their lowest level.
6. Fold table and set interior up as a bed (ie with cushions placed on table)
7. Disconnect gas, water and electrical connections from kitchen.
8. Push kitchen closed.
9. Return support leg to inside of camper.
10. Undo all press studs (being careful not to damage them; they can be quite
fragile!)
11. Return solar panels to inside of camper.