*NOT FOR LIFTING/LOWERING HUMANS
Cover 09/07/2017
INSTALLATION INSTRUCTIONS
FIX MARINE SUPPLY
(866) 998-3625
Special Notes: Improper installation-assembly, or overloading PWC lift
beyond rated capacity will void manufacturer’s warranty. Electrical
connection MUST be grounded with a GFCI device. Proper line voltage
only. No Generators! Generator use will void motor’s warranty!
1,5OO Lb.
Capacity
Question and Answer IconNeed help?

Do you have a question about the Boat Lift Up-N-Over and is the answer not in the manual?

Boat Lift Up-N-Over Specifications

General IconGeneral
BrandBoat Lift
ModelUp-N-Over
CategoryLifting Systems
LanguageEnglish

Summary

General Installation Precautions

Special Notes on Installation and Warranty

Improper installation or overloading voids warranty. Electrical connections require GFCI grounding.

Critical Instructions to Avoid Warranty Void

Adhering to specific instructions regarding bolts, mounting, lubrication, and power is crucial to maintain warranty.

Step 1: Installing PILING-MOUNT bracket

Bracket Placement and Plumbness

Place bracket 42" above dock surface and ensure it is 100% PLUMB for correct orientation.

Drilling Bolt Holes and Hardware

Drill (6) holes using the bracket as a template in a cross-pattern with 3/4" diameter bolts.

Step 2: MAST installation

Mast Insertion into Head Assembly

Insert the heavy-duty aluminum mast into the HEAD ASSEMBLY, ensuring correct orientation for bolt hole alignment.

Step 3: HEAD ASSEMBLY to PILE MOUNT

Securing Head Assembly to Pile Mount

Install the PILE MOUNT between swivel-brackets, locking it with the HEAD SWIVEL PIN and nylon bushing.

Step 4: CONNECT MAST to CRADLE ARM

Connecting Mast to Cradle Arm

Raise mast, slide underneath CRADLE ARM, then drop and fasten with three 1/2" stainless bolts.

Step 5: Attach GEARBOX to HEAD ASSEMBLY

Gearbox and Cable Winder Assembly

Mount CABLE WINDER to HEAD ASSEMBLY, connect GEARBOX shaft, and attach motor to GEARBOX.

Step 6: Connect stainless CABLE to CRADLE ARM

Cable Attachment to Cradle Arm

Connect the stainless cable to the CRADLE ARM using the supplied 3/4" stainless bolt.

Step 7: Aluminum BUNK attachment

Bunk Assembly and Mounting

Assemble Aluminum Bunks to their brackets and mount them into place on the CRADLE ARM.

Step 8: Aluminum GUIDE POST attachement

Guide Post Bracket and Post Installation

Attach GUIDE POST BRACKET to CRADLE ARM, insert GUIDE POST, and cover with PVC cap, avoiding motor assembly.

Final Operational Notes

Important Reminders for Safe Operation

Never ride lift, ensure ample grease, maintain proper voltage, and manage cable slack to prevent damage.