EasyManua.ls Logo

Bobcat 741 - Page 283

Bobcat 741
371 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DISTRIBUTOR
Removal
And
Installation
Turn the crankshaft until
No.
1 piston is at T.D.C. on
compression stroke.
Disconnect the negative battery cable.
Remove the distributor cap [A).
Disconnect the vacuum hose.
Remove the distributor mounting nut
[B).
Installation: Align the mating mark (Item
1)
[C) on the
distributor housing with the mark on the distributor gear.
Point
Gap
Adjustment
Remove the distributor cap.
Remove the rotor.
Turn the crankshaft until the points are wide open. Check
the breaker point gap with a feeler gauge,
if
it
is
out of
specifications, adjust as
follows:
Breaker Point
Gap.
. . . . . . . . . . . . . . . 0.018-0.021 inch
(0,48-0,53 mm)
Loosen the two
lock screws.
Put a screwdriver
blade into the hole (Item 1)
[0).
Adjust the points to the correct specifications.
Tighten the two
lock screws.
NOTE: After
the
breaker
points
are
adjusted,
you
must
time
the
engine. (See Page
7B-4.)
Added
Sept.
90
D
Breaker
-70-5-
Lock
Screw
8-09784
741, 742, 743,
7430S
Bobcat
Loader
Service
Manual