12
STEP
2
Be careful to assemble all components
in the sequence they are presented.
NOTE:
Finger tighten all hardware rst in this step. Wrench tighten ALL hardware at the end of
and after STEP 2A. Some components may be pre-assembled. Nylon lock nuts will not
fully screw onto bolts, they must be wrench tighten to fully go on.
2A. AttachFrontStabilizer(B)toMainFrame(A)using:
2 - (#1) M12x25mm Hex Head Bolt
2 - (#4) M12 Flat Washer
2 - (#5) M12 Lock Washer