5
Installation and Commissioning
The unit must be installed by a competent person, on a firm level surface capable of supporting the
weight of the machine when the bath is filled, and all connections made. Please ensure that the unit is
positioned at least 100mm from any other surfaces, as it is important that the ventilation openings in the
machine are not blocked and allow the free movement of air for both the carbonator & non-carbonator
version. Inadequate ventilation will shorten the life of the fridge system.
Locate a container beneath the bath overflow to prevent any water spillage as ice is formed in the bath,
and fill the bath with cold water until it comes out of the overflow.
For the EXL95H/96H Carbonator Deck
Turn off the soda recirc pump and disable the can fill circuit by means of the 2 switches located on the
front of the unit. Important: Great care
must be taken on commissioning the machine when power
is applied to the unit. Power may now be applied to the machine to allow the fridge to form an ice bank
while the rest of the system is installed.
Connect the water inlet to a potable water supply, connect the soda recirc lines to the bulkhead
connectors, and then connect the CO2 inlet but do not turn on just yet.
Turn on the water supply and turn on the can fill circuit (black switch). Allow the can to carb can to fill
with water. The can fill pump will switch off once the can is full, this should take between 5-10 seconds.