Commissioning log for the appliance | 79
6 720 810 590 (2015/05)
Greenstar FS
Modified service functions: (Select the modified service functions and enter the values here.)
Example: Service function 7.d changed from 00 to 01
Heating control:
FW 200
FB 100 × ...... Qty, coding heating zone(s):
ISM 2
IPM 2 × ...... Qty, coding heating zone(s):
Other:
Heating control programmed, notes:
Documented the modified settings of the heating control in the control operating/installation instructions
The following work has been carried out:
Electrical connections checked, notes:
Condensate trap filled Carry out a combustion air/flue gas test
Function check carried out Tightness test carried out on the gas and water sides
Commissioning includes checking the settings, a visual heating leak test and a functional check of the boiler and control. The system installer
conducts a test of the heating system.
This system has been checked to the extent described.
___________________________________________________________
Name of service installing contractor
The documents have been handed over to the home owner/operator. The
home owner/operator has been instructed regarding safety and operation
of the boiler and accessories, including the need for regular scheduled
maintenance.
__________________________________________________________
Date, owner/operator signature
____________________________________________________________
Date, system installer's signature
Affix the test report here.