EasyManua.ls Logo

Boss Ladderspan 3T - User Manual

Boss Ladderspan 3T
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
LADDERSPAN 3T
Mobile Aluminium Tower
1450/850 Ladderspan
3T - Through the Trapdoor Method
USER GUIDE

Other manuals for Boss Ladderspan 3T

Question and Answer IconNeed help?

Do you have a question about the Boss Ladderspan 3T and is the answer not in the manual?

Summary

Safety First Overview

Introduction to User Guide

Guide overview, online resource availability, and product use cases.

Product Compliances

Details of testing and certification against industry standards like EN 1004.

Preparation and Inspection Steps

Essential pre-use checks for tower components and functionality.

Safe Use and Equipment Handling

Safe Use Guidelines

Operational rules, load limits, safe climbing, and unattended tower recommendations.

Lifting Equipment Safely

Procedures for lifting tower components using reliable materials and knots.

Tower Stability and Movement

Stabilisers and Ballast Requirements

Mandatory fitting of stabilisers/outriggers and ballast for stability.

Safe Tower Movement Procedures

Guidelines for manual movement, ground conditions, and height restrictions.

During Tower Use Precautions

Wind and Building Effects

Warnings on wind speed impact and funnelling effects in buildings.

Operational Safety During Use

Rules on platform abuse, component integrity, horizontal forces, and platform usage.

Tower Securing and Maintenance

Ties for Stability

When and how to use rigid, two-way ties for tower stability at height.

Maintenance, Storage, Transport

Procedures for component inspection, repair, cleaning, storage, and transport.

Quantity Schedule - 1450 Towers

Component Quantities by Height

Table detailing required components for 1450 towers at various working heights.

Quantity Schedule - 1450 Towers

Working Platforms and Load Limits

Information on the number of platforms allowed and maximum safe working loads.

Platform Loading Guidelines

Details on load distribution per platform and compliance with EN 1004.

Quantity Schedule - 1450 Towers

Platform Loading and Compliance

Further details on platform loading, guardrails, and EN 1004 requirements.

Quantity Schedule - 1450 Towers

Ballast, Outriggers, Stabilisers

Information on ballast, mobile outrigger kits, and stabiliser types.

Quantity Schedule - 850 Towers

Component Quantities by Height

Table listing components for 850 towers across different working heights.

Quantity Schedule - 850 Towers

Component Quantities (Continued)

Continuation of component requirements for 850 towers at various heights.

Quantity Schedule - 850 Towers

Working Platforms and Load Limits

Details on platform limits and safe working loads for 850 towers.

Quantity Schedule - 850 Towers

Ballast, Outriggers, Stabilisers

Information on ballast, outrigger kits, and stabiliser dimensions for 850 towers.

Assembly and Dismantling Procedures

Building a BoSS Tower

Step-by-step guide for tower assembly, including frame types and platform heights.

Dismantling a BoSS Tower

Instructions for safely taking down the tower by reversing the assembly sequence.

Safety Checklist

Pre-Use Inspection Checklist

Comprehensive checklist for ensuring safe erection and operation before using the tower.

Assembly Procedure - 1450 Towers

Initial Assembly Steps

First steps for 1450 towers: castors, adjustable legs, and base frames.

Assembly Procedure - 1450 Towers

Fitting Horizontal Braces

Instructions for fitting horizontal braces to provide support and square the tower.

Assembly Procedure - 1450 Towers

Adding Frames and Diagonal Braces

Steps for adding end frames, diagonal braces, and ensuring verticality with spirit level.

Assembly Procedure - 1450 Towers

Installing Decks and Guardrails

Fitting trapdoor decks and guardrails to the tower for safety.

Assembly Procedure - 1450 Towers

Extending Tower Height

Procedures for adding more frames, braces, and decks for greater heights.

Assembly Procedure - 1450 Towers

Fitting Toeboards and Tower Completion

Final steps to fit toeboards and complete the tower assembly.

Dismantling Procedure

Removing Guardrail Braces

Specific steps for safely removing guardrail braces during dismantling.

Assembly Procedure - 850 Towers

Initial Assembly for 850 Towers

Starting steps for 850 towers: castors, legs, frames, and horizontal braces.

Assembly Procedure - 850 Towers

Installing Decks and Guardrails (850)

Fitting trapdoor decks and guardrails for 850 towers.

Assembly Procedure - 850 Towers

Adding Diagonal Braces and Stabilisers

Fitting diagonal braces, stabilisers, and end frames for 850 towers.

Assembly Procedure - 850 Towers

Adding Braces and Decks (850)

Continuing assembly by adding diagonal braces and trapdoor decks.

Assembly Procedure - 850 Towers

Continuing Assembly and Guardrails (850)

Steps to continue assembly, add guardrails at each platform level.

Dismantling Procedure

Tower Dismantling Steps

Reversing assembly sequence for safe dismantling, focusing on guardrails.

Fitting Toeboards

Toeboard Clip and Board Placement

How to attach toeboard clips and insert 25mm toeboards.

Stabilisers and Outriggers

Stabiliser Installation and Adjustment

Attaching stabilisers to corners and adjusting for firm ground contact.

Mobile Outrigger Kit Information

Referral to supplier for details on mobile outrigger kits.

Summary

Safety First Overview

Introduction to User Guide

Guide overview, online resource availability, and product use cases.

Product Compliances

Details of testing and certification against industry standards like EN 1004.

Preparation and Inspection Steps

Essential pre-use checks for tower components and functionality.

Safe Use and Equipment Handling

Safe Use Guidelines

Operational rules, load limits, safe climbing, and unattended tower recommendations.

Lifting Equipment Safely

Procedures for lifting tower components using reliable materials and knots.

Tower Stability and Movement

Stabilisers and Ballast Requirements

Mandatory fitting of stabilisers/outriggers and ballast for stability.

Safe Tower Movement Procedures

Guidelines for manual movement, ground conditions, and height restrictions.

During Tower Use Precautions

Wind and Building Effects

Warnings on wind speed impact and funnelling effects in buildings.

Operational Safety During Use

Rules on platform abuse, component integrity, horizontal forces, and platform usage.

Tower Securing and Maintenance

Ties for Stability

When and how to use rigid, two-way ties for tower stability at height.

Maintenance, Storage, Transport

Procedures for component inspection, repair, cleaning, storage, and transport.

Quantity Schedule - 1450 Towers

Component Quantities by Height

Table detailing required components for 1450 towers at various working heights.

Quantity Schedule - 1450 Towers

Working Platforms and Load Limits

Information on the number of platforms allowed and maximum safe working loads.

Platform Loading Guidelines

Details on load distribution per platform and compliance with EN 1004.

Quantity Schedule - 1450 Towers

Platform Loading and Compliance

Further details on platform loading, guardrails, and EN 1004 requirements.

Quantity Schedule - 1450 Towers

Ballast, Outriggers, Stabilisers

Information on ballast, mobile outrigger kits, and stabiliser types.

Quantity Schedule - 850 Towers

Component Quantities by Height

Table listing components for 850 towers across different working heights.

Quantity Schedule - 850 Towers

Component Quantities (Continued)

Continuation of component requirements for 850 towers at various heights.

Quantity Schedule - 850 Towers

Working Platforms and Load Limits

Details on platform limits and safe working loads for 850 towers.

Quantity Schedule - 850 Towers

Ballast, Outriggers, Stabilisers

Information on ballast, outrigger kits, and stabiliser dimensions for 850 towers.

Assembly and Dismantling Procedures

Building a BoSS Tower

Step-by-step guide for tower assembly, including frame types and platform heights.

Dismantling a BoSS Tower

Instructions for safely taking down the tower by reversing the assembly sequence.

Safety Checklist

Pre-Use Inspection Checklist

Comprehensive checklist for ensuring safe erection and operation before using the tower.

Assembly Procedure - 1450 Towers

Initial Assembly Steps

First steps for 1450 towers: castors, adjustable legs, and base frames.

Assembly Procedure - 1450 Towers

Fitting Horizontal Braces

Instructions for fitting horizontal braces to provide support and square the tower.

Assembly Procedure - 1450 Towers

Adding Frames and Diagonal Braces

Steps for adding end frames, diagonal braces, and ensuring verticality with spirit level.

Assembly Procedure - 1450 Towers

Installing Decks and Guardrails

Fitting trapdoor decks and guardrails to the tower for safety.

Assembly Procedure - 1450 Towers

Extending Tower Height

Procedures for adding more frames, braces, and decks for greater heights.

Assembly Procedure - 1450 Towers

Fitting Toeboards and Tower Completion

Final steps to fit toeboards and complete the tower assembly.

Dismantling Procedure

Removing Guardrail Braces

Specific steps for safely removing guardrail braces during dismantling.

Assembly Procedure - 850 Towers

Initial Assembly for 850 Towers

Starting steps for 850 towers: castors, legs, frames, and horizontal braces.

Assembly Procedure - 850 Towers

Installing Decks and Guardrails (850)

Fitting trapdoor decks and guardrails for 850 towers.

Assembly Procedure - 850 Towers

Adding Diagonal Braces and Stabilisers

Fitting diagonal braces, stabilisers, and end frames for 850 towers.

Assembly Procedure - 850 Towers

Adding Braces and Decks (850)

Continuing assembly by adding diagonal braces and trapdoor decks.

Assembly Procedure - 850 Towers

Continuing Assembly and Guardrails (850)

Steps to continue assembly, add guardrails at each platform level.

Dismantling Procedure

Tower Dismantling Steps

Reversing assembly sequence for safe dismantling, focusing on guardrails.

Fitting Toeboards

Toeboard Clip and Board Placement

How to attach toeboard clips and insert 25mm toeboards.

Stabilisers and Outriggers

Stabiliser Installation and Adjustment

Attaching stabilisers to corners and adjusting for firm ground contact.

Mobile Outrigger Kit Information

Referral to supplier for details on mobile outrigger kits.

Boss Ladderspan 3T Specifications

General IconGeneral
MaterialAluminum
Platform Height2.5m
Width0.8m
Length3.0m
Weight35kg
ModelLadderspan 3T