EasyManua.ls Logo

Brother HL-5140 - CHAPTER 3 PCL5 C

Brother HL-5140
276 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 4 DISASSEMBLY AND RE-ASSEMBLY
4-36
(13) Remove the HR bearing 25.
(14) Remove the HR gear 34.
(15) Remove the HR retaining ring 25.
(16) Remove the heat roller washer 25.
(17) Remove the HR bearing 25.
Fig. 4-62
!
CAUTION:
Never touch the surface of the heat roller.
NOTE:
• When re-assembling the heat roller 25 to the FU frame upper, place the two projections
onto the bosses on the frame as shown in the figure below.
Fig. 4-63
HR gear 34
HR retaining ring 25
Heat roller 25
HR bearing 25
Heat roller 25
(projection)
HR gear 34
HR bearing 25
(boss)
Heat roller washer 25
HR bearing 25

Table of Contents

Other manuals for Brother HL-5140

Related product manuals