1.规格/SPECIFICATIONS
4
使
使
PLEASE DOWN LOAD THE MANUAL AND SPARE PARRTS FROM THE FOLLOWING WEBSITE:
ÇäÑÌÇÁ Êfåêä ãÊêÈ ÇäÊÙäêåÇÊ èâXÙ ÇäÊÈÏêä åæ ÇäåèâÜ ÇäÊÇäê:
POR FAVOR DESCARGAR EL MANUAL Y LIBRO DE PARTES Y REPUESTOS LO SIGUIENTE EN
SITIO WEB:
Пожалуйста, загрузите инструкцию по эксплуатации и деталировку
( список запасных частей ) со следующего вебсайта:
http://download.chinajack.com
QB/T2380-2013
Standard code of the products QB/T2380-2013
JACK SEWING MACHINE
HTTP://WWW.CHINAJACK.COM 2.缝纫机的安装/INSTALLATION
JACK SEWING MACHINE CO.,LTD.
Address of Company
1008
NO.1008 , DONGHAI AVENUE EASTJIAOJIANG DISTRICT,TAIZHOU CITY , ZHEJIANG
318000
Domestic Trade Department
TEL0086-0576-881177788 88177789
FAX0086-0576-881177758
International Trade Department
TEL0086-0576-881177782 88177774
FAX0086-0576-881177787
400-8876858
http://www.chinajack.com
You will be not informed if the file has been revised.Please set sample as standard.
2
用途
一般布料、薄料、中厚料
中厚料、厚
缝纫速度
最高
4,000rpm
最高
3,500rpm
最大针脚长
5mm
机针
DBx1 #9~#1814#
DPx5 #20~#23#21
压脚高度(自动抬压脚)
9mm(标准)13mm(最大)
9mm(标准)13mm(最大)
使用机油
New Defrix Oil NO.10
机油
Application
Mdeium-weight materials,
Heavy-weight materials
Sewing speed
Max. 3,500rpm
Max.Stitch length
5mm
Needle
DPx5 #20~#23#21
Presser foot lift
9mmstandard;13mmMax.
Lubricating oil
New Defrix Oil NO.10
(1) 油盘托盘安装
1)
先将油盘支
和油盘座垫分别套在油的四角上,再将油盘安装在台板上。
2)
如图所示,安装吋要确保两个油盘支朝向操作者一边,两个油盘座是在有机头连接
的那一侧。
3)
先将机头连接钩座安装在台板上,再将机头连接钩放入底板孔内,最后将机头放置于
板上,且机头连接钩要与台板上的机头连接钩座相嵌合。
Question and Answer IconNeed help?

Do you have a question about the Bruce R5E and is the answer not in the manual?

Summary

Specifications

Installation

Oil Pan Tray Installation

Details on installing the oil pan support and cushion on the machine table.

Before Operation

Oil Reservoir Check

Ensure the oil reservoir is filled with oil before starting the machine.

Motor Rotation Direction Check

Verify the motor's rotation direction is counterclockwise when viewed from the handwheel.

Voltage and Phase Confirmation

Confirm correct voltage and phase against electronic identification ratings.

Operation Precautions

Keep Hands Away from Needle Area

Avoid placing hands near the needle when the power is ON or machine is operating.

Avoid Finger in Thread Take-up Cover

Do not insert fingers into the thread take-up cover during operation.

Turn Off Power When Tilting Machine Head

Always switch off the power before tilting the machine head.

Turn Off Power When Leaving Machine

Ensure the power is turned off when the operator leaves the machine.

Keep Clear of Moving Parts

Keep hands, heads, or objects away from the bobbin winder and handwheel during operation.

Use With Protectors Attached

Operate the machine only with all safety guards and protectors attached.

Cleaning Precautions

Do not clean the machine head with thinner or paint solvents.

Adjusting Knee Lifter Height

Standard and Maximum Lift Height

Standard lift is 10mm; adjust up to 13mm using the knee lifter adjust screw.

Check Needle Bar Clearance

Ensure the needle bar's bottom end does not hit the presser foot when lift exceeds 10mm.

Lubrication

Oil Level and Refill

Fill oil reservoir to HIGH mark; refill when level drops below LOW mark.

Checking Oil Flow

Observe oil flow through the sight window after lubrication to confirm proper lubrication.

Oil Change Schedule

Replace oil after 1 month for new machines, then every six months.

Break-in Operation

Run machine at 2,500-3,000 RPM for 10 minutes for break-in on new or unused machines.

Information on Lubrication

Oil Refill Procedure

Refill oil pan to HIGH mark with specified oil; refilling is needed below LOW mark.

Splash Indicator

Splashing oil through sight window indicates adequate lubrication.

Oil Replacement Schedule

Replace oil after 1 month for new machines and every six months thereafter.

Pedal Pressure and Stroke Adjustment

Adjusting Pedal Pressure (Front)

Change spring position to adjust pressure; left side decreases, right side increases.

Adjusting Pedal Pressure (Back)

Use regulator screw; turning in increases pressure, turning out decreases it.

Adjusting Pedal Stroke

Insert connecting rod into the right hole to increase pedal stroke.

Pedal Adjustment

Connecting Rod Installation

Align spherical head and connecting rod by moving pedal adjustment plate.

Pedal Angle Adjustment

Adjust connecting rod length to freely change pedal tilt angle.

One-Touch Type Reverse Feed Stitching

Operating Reverse Stitching

Press switch button to perform reverse feed stitching; release to resume normal stitching.

Needle and Hook Timing

Adjusting Needle Bar Height

Adjust needle bar height by loosening setscrew and positioning needle bar.

Hook Position Adjustment

Align hook point with needle slot and set clearance for proper timing.

Needle and Hook Relationship

Hook Timing Setup

Ensure hook tip is 1-1.5mm above needle slot and 0.05mm from needle groove plane.

Thread Tension Adjustment

Needle Thread Tension

Adjust needle thread tension using nut; clockwise increases tension, counterclockwise decreases.

Bobbin Thread Tension

Adjust bobbin thread tension using screw; clockwise increases tension, counterclockwise decreases.

Thread Take Up Spring

Adjusting Thread Take-Up Stroke

Turn tension post clockwise to increase stroke, counterclockwise to decrease.

Adjusting Thread Take-Up Pressure

Adjust tension post; clockwise increases pressure, counterclockwise decreases.

Safe Use of Industrial Sewing Machines

Basic Safety Measures

Observe basic measures, undergo specialized training, and check safety devices.

Power Off During Maintenance

Turn off power immediately when installing/changing needles, presser feet, or repairing.

Power Off When Leaving Workstation

Ensure power is turned off when leaving the machine or workplace.

Motor Stop Before Interaction

Wait for the clutch motor to stop completely before interacting with it.

Handling Lubricants

Wash immediately if machine oil or other liquids get into eyes or on skin.

Avoid Touching Powered Parts

Do not touch powered parts or devices while the machine is energized.

Professional Maintenance

Repairs, renovations, and adjustments must be done by specialized technicians.

Regular Cleaning

The machine should be cleaned regularly during operation.

Electrical Safety and Environment

Install ground lines and operate in an environment free from strong noise sources.

Specialized Power Plug Installation

The power plug must be installed by a specially-assigned person.

Designated Use Only

Industrial lockstitch and overlock machines must only be used for their designated purposes.

Environmental Requirements

Waste Disposal

Dispose of waste oil and products according to local environmental protection requirements.

Power Conservation

Turn off the power after use to reduce power consumption.

Extend Product Lifespan

Use under specified voltage and environment to extend service life and reduce waste.

Scrapped Equipment Disposal

Do not treat scrapped machines as household garbage; comply with local disposal laws.

Bruce R5E Specifications

General IconGeneral
BrandBruce
ModelR5E
CategorySewing Machine
LanguageEnglish