EasyManua.ls Logo

Buchi Lyovapor L-200 Pro User Manual

Buchi Lyovapor L-200 Pro
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Lyovapor
TM
L-200 / L-200 Pro
Operation Manual
11593861D en

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Buchi Lyovapor L-200 Pro and is the answer not in the manual?

Buchi Lyovapor L-200 Pro Specifications

General IconGeneral
BrandBuchi
ModelLyovapor L-200 Pro
CategoryIndustrial Equipment
LanguageEnglish

Summary

Safety

Proper Use

Defines the intended use of the Lyovapor L-200.

Use Other Than Intended

Details prohibited applications and risks of misuse.

Residual Risks

Outlines potential risks even with correct use.

Installation

Installation Site

Requirements for the location where the instrument will be installed.

Putting Instrument in Operation

Steps for preparing and connecting the instrument for operation.

Assembling Drying Attachments

Guides the assembly of various drying attachments.

Operating the Control Panel

Preparing the Instrument

Steps to prepare the instrument before freeze-drying.

Starting Freeze-Drying

Procedure for initiating the freeze-drying process.

Editing Parameters During Process

How to adjust parameters while a process is running.

Ending Freeze-Drying

Steps to safely end the freeze-drying process.

Shutting Down the Instrument

Procedure for safely shutting down the instrument.

Operating Pro Control Panel

Creating a New Method

Steps for creating a new freeze-drying method.

Setting Sample Collapse Temperature

Defining the sample collapse temperature parameter.

Setting Method Steps

Defining the individual steps within a freeze-drying method.

Setting Method Phases

Configuring phases like primary and secondary drying.

Pressure Difference Test

Setting up the pressure difference test for end point definition.

Temperature Difference Test

Setting up the temperature difference test for end point definition.

Preparing Instrument for Method

Steps to prepare the instrument before using a method.

Selecting a Method

How to choose and activate a freeze-drying method.

Starting Freeze-Drying with Method

Initiating freeze-drying using a selected method.

Ending Freeze-Drying with Method

Safely concluding a freeze-drying process run with a method.

Shutting Down After Method Run

Procedure for shutting down after completing a method.

Preparing Instrument for Manual Run

Steps to prepare for manual freeze-drying.

Starting Manual Freeze-Drying

Initiating a manual freeze-drying process.

Mobile Connection

Cleaning and Servicing

Regular Maintenance Work

Scheduled maintenance tasks for instrument components.

Help with Faults

Troubleshooting

Common problems and initial troubleshooting steps.

Faults, Causes, and Remedies

Detailed table of faults, their possible causes, and solutions.