EasyManua.ls Logo

CALEFFI Z-one ZSR10 Series - Page 17

CALEFFI Z-one ZSR10 Series
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
Sequence of Operation / Settings
• A demand occurs from the thermostat closing
RtoWontheZSR101control.The“ZONE”
LED illuminates.
• The ZSR101 control will power relay #1 and
#2 closing C to NO.
• The NO terminal of relay #1 will send out
120 VAC to your pump. Relay #2 provides
a dry contact closure to signal the boiler of a
demand.
NOTE: Relay #1 can be used as a dry contact
as well by removing the factory installed
jumper between L and C.
• When the thermostat demand is satisfied R to
Wwillopenandthe“ZONE”LEDwillturnoff.
• The control will remove power from relays #1
and #2 opening C to NO. This will drop 120
VAC to your pump and terminate the demand
to your boiler.
Description of terminals
= Ground
N = Neutral (Common leg of 120 VAC)
L = Line (live leg of 120 VAC)
C = Common terminal
NO = Normally Open terminal
NC = Normally Closed terminal
Note: There is a factory installed jumper between the 120
VAC line (L) and the common terminal of relay #1 (C).
Thermostat terminals
R = 24 VAC
W = Heat call
C
= Common of 24 VAC
WARNING: NEVER CONNECT R & C DIRECTLY,
this will be a direct short on the 24 VAC supply

Related product manuals