EasyManua.ls Logo

CALEFFI Z-one ZSR10 Series - Page 31

CALEFFI Z-one ZSR10 Series
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
Sequence of Operation / Settings
• Master / Slave switch: Master
• Priority Switch: OFF
• Remote Enable Switch: OFF
• Exercise Switch: OFF
• Post Purge Zone 1 Switch: OFF
• Status During Priority Jumper: OFF
• A demand occurs from any thermostat closing
RtoW.The“PUMPON”LEDilluminatesfor
the corresponding zone.
• ZSR control sends 120 VAC to corresponding
zone pump and the primary pump output.
The control will close the XX contacts to signal
the boiler of a demand.
• When the demand from the last thermostat
calling is satisfied (thermostat opens R to W),
the XX contacts are opened and the “PUMP
ON”LEDturnsoff.The120VACtothezone
pump and primary pump outputs are dropped.
• ALTERNATE WIRING: The boiler pump can be
controlled by the boiler if it is equipped to do
so.
WARNING: NEVER CONNECT R & C DIRECTLY,
this will be a direct short on the 24 VAC supply
Description of terminals
= Ground
N = Neutral (Common leg of 120 VAC)
L = Line (Hot leg of 120 VAC)
Thermostat terminals
R = 24 VAC
W = Heat call
C
= Common of 24 VAC
Boiler terminals
XX = Dry contact rated up to 120 VAC, 2 Amps,
which is typically connected to TT on boiler control,
closes when any zone calls including priority.
ZONE 1 E/S = Dry contact rated up to 120 VAC, 2
Amps, will close with any call to ZONE 1. Zone 1
can be enabled as a priority zone, typically used for
heating domestic hot water. The ZONE 1 E/S can
be used to close a DHW contact on boiler controls
equipped with these features. AUX = Dry contact,
rated up to 120 VAC, 2 Amps, close when any zone
calls and can be used
as signal to a variable speed
self regulated pump or other controls.
Dip switch description
Master / Slave: allows for unlimited expansion to
additional ZVR or ZSR relays. Only one Master.
P
riority ON / OFF: When priority switch is ON, upon
demand to TSTAT 1, ZONE 1 will operate as priority and
all other zones are temporarily switched off (with 1 hour
time-out). When priority is OFF, any zones that were
active when ZONE 1 was switched on will remain on.
Remote Enable ON / OFF: When remote enable
mode is ON, the board will hold off all zones waiting
for an external 24 - 120 VAC voltage from the boiler.
Exercise ON / OFF: When exercise mode is ON,
each circulator is switched on for 30 seconds
following 72 hours of inactivity.
Post Purge Zone #1 ON / OFF: When post purge is
ON, Zone 1 pump continues operating for 2 minutes
after the priority zone is switched OFF.

Related product manuals