EasyManua.ls Logo

CALEFFI Z-one ZSR10X Series - Page 37

Default Icon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
29
SYSTEM PUMP = Runs when any
zone calls for heat.
SEC PUMP = Runs when any zone
calls for heat.
ZONE 1 PUMP = Runs when zone 1
thermostat calls for heat and zone 1
end switch has closed. A jumper is
required between the ZONE 1 END
SWITCH terminals when using a pump
for ZONE 1 instead of a zone valve.
STATUS DURING ZONE 1 DEMAND ON / OFF = When status jumper is
placed on ON pins, the secondary and / or system pump will continue to
operate during ZONE 1 demand. When jumper is placed on OFF pins, the
corresponding pump will be OFF during ZONE 1 demand.
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
POWER
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
T-STAT 2
C
R
W
T T COM
COMMS
D
P
ZONE 1
E / S
X X
T-STAT 3
C
R
W
T T
COM
T-STAT 1
C
R
W
T T COM
T-STAT 4
C
R
W
T T COM
T-STAT 5
C
R
W
T T COM
T-STAT 6
C
R
W
T T COM
AUX
6 Zone
ZSR106
MASTER
PRIORITY ON
REMOTE ENABLE ON
EXERCISE ON
POST PURGE ZONE#1 ON
SLAVE
OFF
OFF
OFF
OFF
REMOTE ENABLE
24 - 120 VAC
L
N
ON
OFF
STATUS
DURING
PRIORITY
The ZVR series of controls is
programmed by the dip switches
which can be positioned for the
following operations.
Master / Slave: allows for unlimited
expansion to additional ZVR or ZSR
relays.
Pump Exercise ON / OFF: When
exercise mode is ON, each circulator
is switched on for 30 seconds following 72 hours of inactivity.
Priority ON / OFF: When priority switch is ON, upon demand, Zone 1 will
operate as priority and all other zones are temporarily switched off (with 1 hour
time-out). When priority is OFF, any zones that were active when Zone 1 was
switched on will remain on.
AUX ON / OFF During Priority Demand: When AUX switch is ON, the AUX
dry contacts will close during a priority demand. When switch is OFF, the AUX
dry contacts will remain open during a priority demand.
6 Zone
ZVR106
L
POWER IN
N
POWER
T-SAT
CALL
ZONE 6
L
ZONE #1
PUMP
N
L
SEC
PUMP
N
STATUS DURING
ZONE #1 DEMAND
ZONE 1
END
SWITCH
MOTOR
ZONE 2
END
SWITCH
MOTOR
ZONE 3
END
SWITCH
MOTOR
ZONE 4
END
SWITCH
MOTOR
ZONE 5
END
SWITCH
MOTOR
ZONE 6
END
SWITCH
MOTOR
L
SYSTEM
PUMP
N
T-STAT 2
C
R
W
T T COM
COMMS
D
P
ZONE 1
E / S
X X
T-STAT 3
C
R
W
T T COM
T-STAT 1
C
R
W
T T COM
T-STAT 4
C
R
W
T T COM
T-STAT 5
C
R
W
T T COM
T-STAT 6
C
R
W
T T COM
AUX
ON
OFF
ON
OFF
VALVE
OPEN
ZONE 1
ZONE 2
ZONE 4
ZONE 5
ZONE 3
MASTER
PUMP EXERCISE ON
PRIORITY ON
AUX ON
SLAVE
OFF
OFF
OFF
DURING PRIORITY DEMAND
Maintenance and Repair: The Caleffi Z-oneâ„¢ multi-zone valve relay comes
with a automatic resettable fuse and requires no maintenance. If control fails or
is damaged, replace control with functional one.
R = 24 VAC.
W = Heat call
C = Common of 24 VAC
Heat demand is initiated by closing R
to W.
24 VAC is always present between R
& C.
Thermostat connections
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
POWER
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
T-STAT 2
C
R
W
T T COM
COMMS
D
P
ZONE 1
E / S
X X
T-STAT 3
C
R
W
T T COM
T-STAT 1
C
R
W
T T COM
T-STAT 4
C
R
W
T T COM
T-STAT 5
C
R
W
T T COM
T-STAT 6
C
R
W
T T COM
AUX
6 Zone
ZSR106
MASTER
PRIORITY ON
REMOTE ENABLE ON
EXERCISE ON
POST PURGE ZONE#1 ON
SLAVE
OFF
OFF
OFF
OFF
REMOTE ENABLE
24 - 120 VAC
L
N
ON
OFF
STATUS
DURING
PRIORITY
L = Line (hot leg) of 120 VAC supply
N = Neutral of 120 VAC
= Grounds
Input power
Pump outputs
6 Zone
ZVR106
L
POWER IN
N
POWER
T-SAT
CALL
ZONE 6
L
ZONE #1
PUMP
N
L
SEC
PUMP
N
STATUS DURING
ZONE #1 DEMAND
ZONE 1
END
SWITCH
MOTOR
ZONE 2
END
SWITCH
MOTOR
ZONE 3
END
SWITCH
MOTOR
ZONE 4
END
SWITCH
MOTOR
ZONE 5
END
SWITCH
MOTOR
ZONE 6
END
SWITCH
MOTOR
L
SYSTEM
PUMP
N
T-STAT 2
C
R
W
T T COM
COMMS
D
P
ZONE 1
E / S
X X
T-STAT 3
C
R
W
T T COM
T-STAT 1
C
R
W
T T COM
T-STAT 4
C
R
W
T T COM
T-STAT 5
C
R
W
T T COM
T-STAT 6
C
R
W
T T COM
AUX
ON
OFF
ON
OFF
VALVE
OPEN
ZONE 1
ZONE 2
ZONE 4
ZONE 5
ZONE 3
MASTER
PUMP EXERCISE ON
PRIORITY ON
AUX ON
SLAVE
OFF
OFF
OFF
DURING PRIORITY DEMAND
6 Zone
ZVR106
L
POWER IN
N
POWER
T-SAT
CALL
ZONE 6
L
ZONE #1
PUMP
N
L
SEC
PUMP
N
STATUS DURING
ZONE #1 DEMAND
ZONE 1
END
SWITCH
MOTOR
ZONE 2
END
SWITCH
MOTOR
ZONE 3
END
SWITCH
MOTOR
ZONE 4
END
SWITCH
MOTOR
ZONE 5
END
SWITCH
MOTOR
ZONE 6
END
SWITCH
MOTOR
L
SYSTEM
PUMP
N
T-STAT 2
C
R
W
T T COM
COMMS
D
P
ZONE 1
E / S
X X
T-STAT 3
C
R
W
T T COM
T-STAT 1
C
R
W
T T COM
T-STAT 4
C
R
W
T T COM
T-STAT 5
C
R
W
T T COM
T-STAT 6
C
R
W
T T COM
AUX
ON
OFF
ON
OFF
VALVE
OPEN
ZONE 1
ZONE 2
ZONE 4
ZONE 5
ZONE 3
MASTER
PUMP EXERCISE ON
PRIORITY ON
AUX ON
SLAVE
OFF
OFF
OFF
DURING PRIORITY DEMAND
Motor = 24 VAC to power the zone
valve motor
End Switch = Connects to end switch
on zone valve. Must be jumpered if
using a 2 –wire zone valve.
Zone valve connections
WARNING: NEVER CONNECT R & C DIRECTLY, this will be a direct short on the 24
VAC supply.
WARNING: When connecting 2 or more Z-one controls, all controls must be powered
by the same 120 VAC circuit.
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
POWER
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
T-STAT 2
C
R
W
T T COM
COMMS
D
P
ZONE 1
E / S
X X
T-STAT 3
C
R
W
T T COM
T-STAT 1
C
R
W
T T COM
T-STAT 4
C
R
W
T T COM
T-STAT 5
C
R
W
T T COM
T-STAT 6
C
R
W
T T COM
AUX
6 Zone
ZSR106
MASTER
PRIORITY ON
REMOTE ENABLE ON
EXERCISE ON
POST PURGE ZONE#1 ON
SLAVE
OFF
OFF
OFF
OFF
REMOTE ENABLE
24 - 120 VAC
L
N
ON
OFF
STATUS
DURING
PRIORITY
Boiler connections:
XX = Dry contact rated up to 120 VAC, 2 Amps, which
is typically connected to TT on boiler control, closes
when any zone calls including priority. ZONE 1 E/S =
Dry contact rated up to 120 VAC, 2 Amps, will close
with any call to ZONE 1. Zone 1 can be enabled as a priority zone, typically
used for heating domestic hot water. The ZONE 1 E/S can be used to close
a DHW contact on boiler controls equipped with these features. AUX = Dry
contact, rated up to 120 VAC, 2 Amps, close when any zone calls and can be
used as signal to a variable speed self regulated pump or other controls.
Communication connections:
Connect terminals to matching terminal of slave boards
D to D, P to P, Ground to Ground. Use 18 gauge
thermostat wire and it should be shielded if located in
close proximity to high voltage wiring
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
POWER
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
T-STAT 2
C
R
W
T T COM
COMMS
D
P
ZONE 1
E / S
X X
T-STAT 3
C
R
W
T T COM
T-STAT 1
C
R
W
T T COM
T-STAT 4
C
R
W
T T COM
T-STAT 5
C
R
W
T T COM
T-STAT 6
C
R
W
T T COM
AUX
6 Zone
ZSR106
MASTER
PRIORITY ON
REMOTE ENABLE ON
EXERCISE ON
POST PURGE ZONE#1 ON
SLAVE
OFF
OFF
OFF
OFF
REMOTE ENABLE
24 - 120 VAC
L
N
ON
OFF
STATUS
DURING
PRIORITY

Related product manuals