5
INSTALLATION
If you have an outlet to the outside, your cooker hood can be connected as below
picture by means of an extraction duct. (enamel, aluminum, flexible pipe or non-
flammable material with an interior diameter of 150mm)
1. Before installation, turn the unit off and unplug it from the outlet.
2. The cooker hoods should be placed at a distance of 65-75cm from the cooking
surface for best effect. See pic 1.
3. The ceiling must can bear at least 120kgs weight, and the thickness of the ceiling
must be ≧30MM, see pic 2, drill 1*170mm round hole in the ceiling.
4. According to the hanging board, drill 12 holes in the ceiling, see pic 2, 12pcs of
ST6*40mm big flat screws will be used to fix the hanging board on the ceiling, and
then 8pcs of M4*10 screws and M4 nut with gasket will be used to connect the
angle iron into the hanging board. See pic 1, calculated the length of the angle iron,
and 16pcs M4*10 big flat screws and M4 nut with gasket will be used to connect the
angle iron and another angle iron ( the overlap length of angle iron can not less
100MM)