6
5.4pcs ST4*8 big flat screws will be used to connect the inside chimney into the
hanging board,see pic 3 then put on the outside chimney, a hook will be used to put
up the outside chimney in order to the next installation, see pic 4.
6. Adjust the 4 glass screws to check whether the glass and the cooker hood body
connected well and fixed. Then install the converter and V-flap on the outlet,
see pic 5.
7. Hold up the hood, 16pcs M4*15 big flat screws will be used to connect the hood
body into angle iron, see pic 6.
8. After ensure all the things ok, put down the hook, take from the outside chimney, all
the installation is finished, see pic7.