8 9
STEP 1
REQUIRES D, I, J, 4
NOTE: Two people are needed to build this unit.
Fasten LEFT FLIP FRAME (I) and RIGHT FLIP FRAME (J) to DRAWER FRONT (4),
using twelve SILVER FLAT HEAD SCREWS(D).
Hand tighten twelve SILVER FLAT HEAD SCREWS.
Repeat for second DRAWER FRONT.
NOTE: Ensure the SILVER FLAT HEAD SCREWS (D) are in the exact holes.
STEP 2
REQUIRES D, I, J, 6, 7
Fasten LEFT FLIP FRAME (I) and RIGHT FLIP FRAME (J) to DIVIDER BACK (6) and
Drawer Bottom (7), using eight SILVER FLAT HEAD SCREWS(D).
Hand tighten eight SILVER FLAT HEAD SCREWS.
Repeat for second DRAWER FRONT.
NOTE: Ensure eight SILVER FLAT HEAD SCREWS (D) are in the exact holes.
Ensure the SILVER FLAT HEAD SCREWS are tightened.
D
D
HUBBARD 2-TIER SHOE STORAGE CABINET
HUBBARD 2-TIER SHOE STORAGE CABINET
STEP-BY-STEP INS STRUCTION
DJ D
I
D
D