109
AUX Auxiliary
C Contactor
CB Circuit Breaker
CT Current Transformer
DS Disconnect Switch
FU Fuse
G Ground
Fig. 50 Cutler-Hammer Wye Delta Unit Mounted Starter Size 6DP
HPR High Pressure Relay
ISM Integrated Starter Module
L Main Supply Power
LL Control Power Supply
M Contactor
RES Resistor
S Contactor
TB Te r m i na l B l o c k
LEGEND NOTES:
1. Power factor correction capacitors (when required) are connected ahead of all current
transformers for proper calibration and sensing by the ISM and IQDP4130.
2. For metering option see Fig. 52.

Table of Contents