START-UP CHECKLIST
(REMOVE AND STORE IN JOB FILE)
I. PRELIMINARY INFORMATION
Model No .............................................................................................................................................................
Serial No ..............................................................................................................................................................
Date .....................................................................................................................................................................
Technician ...........................................................................................................................................................
II. PRE-START-UP
____ Verify that all packing materials have been removed from unit
____ Remove all shipping holddown bolts and brackets per installation instructions
____ Verify that condensate connection is installed per installation instructions
____ Check all electrical connections and terminals for tightness
____ Check that indoor (evaporator) air filter is clean and in place
____ Verify that unit installation is level
____ Check fan wheel propeller for location in housing and setscrew tightness
III. START-UP
Supply Voltage: L1-L2 __________ L2-L3 __________ L3-L1 __________
Compressor Amps: L1 __________ L2 __________ L3 __________
Indoor Fan Amps: __________
Outdoor Motor Amps _______________
AIR TEMPERATURE
Outdoor-Air Temperature: __________ DB
Return-Air Temperature: __________ DB __________ WB
Heating Mode: Heat Pump Supply Air: __________ DB __________ WB
Cooling Mode: Supply Aire Temperature __________ DB __________WB
Electric Heater Supply Air: __________
REFRIGERANT PRESSURES AND TEMPERATURES
Refrigerant Suction __________ psig
Refrigerant Discharge __________ psig
Suction Line Temp*__________
Discharge Line Temp† __________
Liquid Line Temp‡ __________
____ Verify Refrigerant charge using charging tables
____ Verify that 3-phase scroll compressor is rotating in correct direction.
* Measured at suction inlet to compressor
Measured at discharge outlet from compressor.
Measured at liquid line leaving condenser
Copyright 2002 CARRIER Corp. 7310 W. Morris St. Indianapolis, IN 46231 50jzc1si
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.