LOAD CALCULATION
CH ECKLmST--BNSTALLATION
Condensate Drain
Heating Load (Btuh)
Cooling Load (Btuh)
Furnace Model Selection
COMBUSTION AIR AND VENT PIPING
Termination Location
Roof or Sidewall
Termination Kit -- 2 Pipe or Concentric
Combustion-Air Pipe Length
Combustion-Air Pipe Elbow Quantity
Vent Pipe Length
Vent Pipe Elbow Quantity
Pipe Diameter Determined from Sizing Table
Pipe Sloped To Furnace
Pipe insulation
Over Ceilings
Unit Level or Pitched Forward
tnternat Tubing Connections Free of Kinks
and Traps
External Drain Connection Leak Tight and
Sloped
Condensate Trap Primed before Start-Up
Heat Tape Installed if Required
CHECKUST--START-UP
Gas Input Rate
(Set Within 2 percent of Rating Plate)
Temperature Rise Adjusted
Thermostat Anticipator
Anticipator Setting Adjusted or
Cycle Rate (3 Cycles per Hr) Selected
Safety Controls Cheek Operation
Primary Limit
Pressure Switch
Low-Ambient Exposed Pipes
Copyright 2005 CARRIER Corp. _7310 W. Morris St • Indianapolis, IN46231 58mca16si
Manufacturer reserves the right to discontinue, or shange at any time, specifications ol" designs without notioe and without insurring obligations.
B°°k 1h_ PC 101 Catalog No. 535-80158 Printed in USA Form 58MCA-16SI Pg 48 2-05 Replaces: 58MCA-15SI
Tab 16al 8a