A
1
2
3
6
11
English
9 EN
9. Daily Switch-On
Preliminary operations
Check that the coffee beans receptacle (2) is correctly
positioned on the grinder-doser. Lift the lid (1DQG¿OOZLWK
coffee beans. Check that the gate (3) is open, pulling it
towards the outside.
The grinder only works when the ring nut (A)
has been completely tightened.
WARNING: this appliance is provided with
delayed “ON/OFF” automatic device
Switching on – general instructions
“Ensure that the mains switch is on before switching
on the appliance.”
Automatic Grinder-Doser
Turn the appliance on by turning switch (11) to “1”.
This appliance has an automatic cut-off switch that
intervenes every time the doser (6KDVVXI¿FLHQWJURXQG
coffee. If switch (11) is left on position “1” the grinder-doser
will start automatically every time the level of ground coffee
QHHGVWREH¿OOHGXS
At the end of the working day, switch off the appliance by
turning the general switch (11) to “0”.
On Demand Grinder-Doser
Turn the appliance on by turning switch (11) to “1”.
In the On Demand version, when the grinder has been
switched on, the display (10) shows the time set for the
coffee dose (single and double) and a bar indicates the
coffee granulometry with related reference value.
At the end of the working day, switch off the appliance by
turning the general switch (11) to “0”.
USE
OPEN
CLOSED
ON DEMAND VERSION
Grinding
time –
single
coffee
dose
Coffee
granulometry
Reference
value
Grinding
time –
double
coffee
dose