STEELMILL 2000 ADJUST
25
ENGLISH
1. PARTS AND COMPONENTS
Fig. 1
1. Top cover
2. Removable at-grindstone system
3. Power switch
4. Coee-amount adjustment knob (cups)
5. Ground coee tank
6. Coee bean hopper
7. Grinding-level adjustment knob
8. Main body
9. Feet
10. Cleaning brush
NOTE:
The graphics in this manual are schematic representations and may not exactly match the
product.
2. BEFORE USE
- This device is packaged in a way as to protect it during transport. Take the device out of its
box and remove all packaging materials. You can keep the original box and other packaging
elements in a safe place. This will help you prevent product damage when transporting it in
the future. In case the original packaging is disposed of, make sure all packaging materials
are recycled accordingly.
- Make sure all parts and components are included and in good conditions. If there is any
piece missing or in bad conditions, contact the ocial Cecotec Technical Support Service
immediately.
- Place the device on a at, stable, and dry surface.
3. OPERATION
1. Place the at grindstone system inside the coee bean hopper. Make sure the indicator
arrow points to the "Unlock" mark, then turn the at grindstone system until the indicator
arrow points to the "Lock" mark. Turn the at grindstone system in the opposite direction
to remove it. Fig. 2
2. Fill up the coee bean hopper without exceeding the MAX mark. Ret the cover.
3. Ret the top cover. There is a safety switch inside the device, so the latter will not turn on
if the cover is not securely in place and pressing the safety switch. Fig. 3
04277_SteelMill 2000 Adjust_IM_YV_02230227.indd 2504277_SteelMill 2000 Adjust_IM_YV_02230227.indd 25 28/2/23 16:1428/2/23 16:14