EasyManua.ls Logo

Cequent 75234 - Page 5

Cequent 75234
15 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
©2015 Cequent™ Performance Products, Inc. - Printed in Mexico Sheet 5 of 15 75234NP 10-21-15 Rev. A
5. Reinstall all fasteners, fascia, muffler, and side plastic panels removed in Step 1-2.
3a. Hitch installation – feed the carriage bolt ① and spacer ② into frame by
pull wires ⑤, see Figure 6. Leave pull wires attached. Use die grinder to cut off
the stud which is above the center of muffler, see Figure 7.
Proper torque is needed to keep the hitch secure to the vehicle when towing.
3b. Raise hitch into position and slide it over passenger side exhaust first. Feed
pull wires previously installed through bracket holes. Remove pull wires and
loosely install conical washer ③ and hex nut ④ to the hitch.
4. Tighten all 7/16’’ fasteners with torque wrench to 50 Lb.-Ft. (68 N*M)

Related product manuals