bullet cliPs
dig holes 30"
deeP or to
Frost line
For ga
and 3/4" For la
rail to PicKets
ashers
inserte Post stiFFener
inside Post For Fallation
rebar
seParator cliP
la
rebar seParator cliPs
Post suPPor
Post centers
locK toP rail in Post
SECTION A-A
LINE POST STIFFENER
ALUMINUM INSERT
EMBEDMENT DETAIL FOR OPTIONAL
LINE POST STIFFENER ALUMINUM INSERT
TO COMPLY WITH THE HIGH VELOCITY
HURRICANE ZONES SECTION R44003.1.2.1
OF THE FLORIDA BUILDING CODE, A
STEEL INSERT MUST BE ADDED TO
THE TOP RAIL AND THE CENTER PICKET
MUST BE AT TACHED TO THE TOP AND
BOTTOM RAIL WITH (2) #8 X 1-1/2”
SCREWS, CAPS, AND WASHERS
ALUMINUM
INSERT
TOP SOIL
GROUND LEVEL
CONCRETE 3000
P.S.I. MINIMUM
48
GRAVEL FILL
30
2
AA