EasyManua.ls Logo

CFE CFE-10H - Page 17

Default Icon
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
If the battery is installed above the floor or on a platform, make sure that the wall or
platform is capable of supporting the battery’s weight.
5.3.1.1 Wall mounting
NOTICE
1. Use the wall mounting bracket to determine the
installation position, the lower edge of the bracket
should be at least 300mm from the ground, only one
product can be installed on a wall bracket.
2. Drill holes in the wall for M8 expansion screws, at least
50mm deep.
3. fix four M8*50 expansion nails to the wall as shown,
tighten the screws to a torque of approximately 2.5 N.m.
4. fix the left and right brackets to the product using 6 x
M6*12 cross recessed countersunk head screws as
shown, tighten the screws to a torque of approximately
2.0 N.m.
5.3.2 Address selection of Master and Slave Battery (Batteries) connection