COLLOID MILL I. O. & M
7
J
ACKETED STATOR HOUSING
Considerable heat build-up may o ccur through operation of t he m ill,
particularly at close gap settings and es pecially with thicker fluids. Because
of this, water-cool ing jackets are standard equipment on all Greerco
®
Colloid Mills. Should your process requi re it, these jackets may be used to
heat or insulate your product as well.
Stainless steel hose barb connections are provided on the jacket.
Not all applications require use of th e jacket and use of the jacket is
not m andatory for proper m ill opera tion. Water jacket provided
around the stator need only be used as required by your process.
P
RODUCT PROCESSING GUIDELINES
Insure that foreign materials are not introduced into the m ixing head
of your colloi d m ill. Tram p meta l or rigid sol ids m ay severely
damage the mixing head and its components.
When determ ining the appropriate gap setting, the m ill should be
started at a fairly open gap setting, approximately 30 on the indicator
dial. The gap should then be gradually decreased until a suitable
sample is obtained.
Some applications will require the product to be recycled to achieve
the desired refinement; others may be processed after a single pass.
The nature of the fluid, rate of throughput and mill gap setting will all
play a part in determining the amount of processing required.
Processing through a colloid m ill requires prior preparation of a
suitable pre-mix to prevent non-lubricated solids from settling into the
small clearances between the rotor a nd stator. A co lloid mill will not
dry gri nd. Be sure that produc t carrier phase is pre sent to
appropriately lubric ate the seals a nd wearing faces in the unit at all
times.