To prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions to
ensure that the system remains stable. The following guidelines are provided to ensure your safety:
This unit should be mounted at the bottom of the rack if it is the only unit in the rack.
When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the
heaviest component at the bottom of the rack.
If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the
unit in the rack.
Statement 1006
Warning
The following figure shows the standard 19-inch brackets and other optional mounting brackets. You can
order the optional brackets from your Cisco sales representative.
Figure 29: Rack-Mounting Brackets
Cisco Catalyst 9300 Series Switches Hardware Installation Guide
55
Installing a Switch
Rack-Mounting

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco Catalyst C9300-24P and is the answer not in the manual?

Cisco Catalyst C9300-24P Specifications

General IconGeneral
Default AC Power Supply715W AC
DRAM8 GB
Flash Memory16 GB
Operating Temperature0 to 45°C
Operating Humidity5 to 90% relative humidity
Total Ports24

Related product manuals