EasyManua.ls Logo

Clean Water Systems J-PRO-22 - User Manual

Clean Water Systems J-PRO-22
15 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Rev 091718
J-PRO-22 110V – 230V Dual Voltage
Chlorinator Installation & Start-Up Guide
Thank you for purchasing a Clean Water System! With proper
installation and a little routine maintenance, your system will be
providing treated water for many years.
Please review this start-up guide entirely before beginning to install
your system and follow the steps outlined for best results.
LIQUID POOL CHLORINE CAN DAMAGE CLOTHING
AND IRRITATE SKIN AND EYES.
USE RUBBER GLOVES AND EYE PROTECTION WHEN HANDLING.
Specifications:
Pumps 0.1 to 22 gallons of solution per day
Injects into line pressures up to 110 PSI
Dual voltage. 110V or 220V, works on either voltage.
Uses maximum 22 watts of power.
Dimensions:
15-gallon model: 14.5" wide x 24", height including pump is 35".
35-gallon model: 18" wide x 33", height including pump is 44".
NOTE ABOUT 220V INSTALLATIONS: This pump is dual voltage right out of the box and works
on 110v OR 220v.
If you plan to install to run on 220v-240v, we recommend cutting off plug and either hard-
wiring to 220v circuit OR installing a 220v plug-end.
This pump is intended for indoor use, or for outdoors if protected from sunlight and freezing.
2806-A Soquel Ave Santa Cruz CA 95062
For assistance call: 1-831-462-8500
Email us: support@cleanwaterstore.com
More information online: www.cleanwaterstore.com
Question and Answer IconNeed help?

Do you have a question about the Clean Water Systems J-PRO-22 and is the answer not in the manual?

Summary

Pre-Installation Steps

Pre-Installation Checks and Preparations

Includes checking parts, water heater safety, location selection, and gathering parts.

How Your Chlorine Pump Works

Wiring Options for Pump Activation

Explains how to trigger the pump using a flow switch or pressure switch.

220 V Installation Recommendation

Advises cutting off the plug and hard-wiring for 220V use by a technician.

Wiring Options for Pump Activation

Pressure Switch Wiring Methods

Describes using dedicated outlets or direct wiring to pressure switches.

J-PRO-22 Installation Instructions

Prime & Start the Pump

Program Pump and Adjust Speed Settings

How to set the pump speed and save the setting.

Adding Chlorine and Dosage Calculation

Formula for Calculating Solution Strength and Settings

Calculating Dosage and Setting Pump Speed

Covers PPM conversion, daily volume calculation, and setting pump speed.

Clean Water Systems J-PRO-22 Specifications

General IconGeneral
ModelJ-PRO-22
CategoryWater Pump
Max Flow Rate22 GPM
Voltage115/230V
Max Operating Temperature140° F
Outlet Size1 inch
PhaseSingle Phase
Max Suction Lift25 ft