EasyManua.ls Logo

Clearlight PREMIER IS-2 - Page 32

Default Icon
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EU +44 118 324 1242 | Germany +49 361 7473
www.clearlight-saunas.eu
32
Assembly Instructions Cont’d
The right back wall will be connected to the left back wall by connecting together the installed brackets. There are
“+” brackets and “-” brackets on the side of each panel. The right back wall will be installed as follows:
1. Place the right back wall in the slot in the floor.
Lift the right back wall up about 4” (10cm)
higher than the backwall panel (See Picture 1).
2. Place the right back wall panel against the left
back wall (See Picture 2), then slide down the
right back wall panel until the two panels are
equal height. (See Picture 3).
3. If the panels are not equal height or there is
an obvious gap between the two panels, this
means they are not propery attached and you
should try again.
4 - CONNECTING THE RIGHT BACK WALL
Picture 1 Picture 2 Picture 3
If the panels still seem too tight to come
down all the way, try backing off the
bracket screws by one half turn with a
Phillips head screwdriver on the female
bracket.
PREMIER IS-C

Related product manuals