INITIAL STARTUP AND CALIBRATION WITH OPTIONAL ELECTRICAL INTERLOCK BOX
ClearWaterTechairpreparationandozonegenerationsystemCD2000isavacuumtypeandwillrequireadjustmentoftheairow
throughthesystem.OnthefrontoftheelectricalinterlockboxisaVAC/PSIgaugeandanSCFH(StandardCubicFeetperHour)
gauge. These two instruments are all that are required to keep the system operating within the correct parameters.
Theozonesystemwillnotfunctionwithoutaminimumof3”vacuumfromtheventuriinjector(duetoanelectricalvacuum
interlockrelay).Thisisasafetyfeaturedesignedtopreventtheozonegeneratorfromoperatingwithouttheinjectordrawingthegas
into the water.
Afterallthepreviouselectricalandplumbingconnectionshavebeencompleted,thesystemisreadyforstartupandcalibration.
Starting Position:
1. Waterowinginthemainline.
2. Openthevalvestotheozoneloop(ifsoequipped).
3. SwitchthemainservicedisconnectboxtotheONposition.
4. TurntheozonegeneratorONattheswitchlocatedonthefrontoftheelectricalinterlockbox.Note:Thedryershouldalready
beONasitiswiredforcontinuousoperation.Theboosterpumpandozonegeneratorshouldnowbeoperating.
5. Theinjectorcannowbeadjustedforsuction.ObservetheSCFHgaugeandadjusttheairowusingtheneedlevalveon
theSCFHgauge.Closingthisvalvewilllowertheairowandraisethevacuum.Ifproperowandvacuumcannotbe
achieved,readjustthebypassvalveontheinjectormanifolduntilyouachievetheSCFHspeciedfortheozonegeneratorbeing
installed(seechartbelow).Note: The system will only operate for 15 seconds without vacuum.
To reset the time sequence, turn the ‘ON OFF AUTO’ switch OFF and back to ON.
Model Operating SCFH Vacuum
CD2000
8-12 -5 t0 -10
16-20 -5 to -10
VAC/PSI Gauge
Thisgaugemeasurestherelationshipbetweenthesuctionattheinjectorandtheresistancetodrawingthedryairandozone
throughthesystem.Underidealconditions,thisgaugeshouldshowaveryslightvacuum.